32
As part of the start up procedure, it is recommended that a Self Test be performed on the 6300-
M3. Before performing the Self Test you must follow the start up procedure explained in
section 3.1. The Main Operating Screen must be displayed on the Remote unit. There should
be no errors displayed on line 4 of the display. If there are errors on line 4 of the display, press
CANCEL to clear each error as it appears, until line 4 is clear.
Now press NEXT SCREEN twice. The display will show the screen shown below.
SELF TESTS
Please vent Pitot and Static ports
to ambient, then press “GO”
There are seven tests performed on the system. These tests check every subsystem for
acceptable operation. If a malfunction is detected in any part of a subsystem, that subsystem is
flagged as defective. Once a defective subsystem is detected, the self test function is aborted.
Therefore, if more than one subsystem is defective, the first defective subsystem will cause the
tests to abort, thereby preventing the user from detecting the flaws in the other malfunctioning
subsystems.
The tests are performed on the following subsystems:
1.
System ROM.
2.
System RAM.
3.
Ps pressure measurement system
4.
Pt pressure measurement system
5.
Pressure and Vacuum pump assembly
6.
Ps pressure control system
7.
Pt pressure control system.
To start the Self Test, please make sure that the Pitot and Static outputs are open to ambient,
and then press GO. The status of each test will be displayed on the screen as shown below.
ROM OK
RAM OK
Ps measurement system OK
Pt measurement system OK
After the pump section test has passed successfully, the screen is cleared and the status of the
Summary of Contents for 6300-M3
Page 10: ...3 Figure 2 1 A ...
Page 11: ...4 Figure 2 1 b ...
Page 15: ...8 Figure 2 2 ...
Page 16: ...9 Figure 2 3 ...
Page 71: ...64 Humidity 5 to 95 non condensing ...