LAVAZZA MATINEE 230V Maintenance Manual For Technical Assistance Download Page 19

“E

SPRESSO

P

OINT MOD

. M

ATINÈE

230 V”

C

OD

. 83192 / R

EL

. 2.00 /  J

ANUARY

2003

Loosen the bracket (

A

) and remove spring (

E

) to

extract the thermostats from their slots.
Loosen the stop (

B

) and separate the two cables.

Extract the ground cable (

C

).

Extract the cables (

D

).

Unscrew as shown in the diagram and remove cap
(

A

) on the solenoid valve.

Unscrew and remove the central nut (

D

).

Unscrew and remove the 6 

(B

) screws and the two

(

C

) screws after having removed the two respective

locking nuts under the FAP-press cover.

Caution
To carry out the operations the machine
must be cold

Unscrew the two screws shown in the diagram
removing the micro from its clip.

For micro substitution extract the two connection
wires.

First carry out the operations described in schedule 3.A
“Front part preliminary maintenance operations”

8

8

1

C

6

6

3.1

1/4

Deliver y unit - chamber 

maintenance

4

Summary of Contents for MATINEE 230V

Page 1: ...COD 83192 REL 2 00 JANUARY 2003 ESPRESSO POINT MOD MATIN E 230 V E S P R E S S O P O I N T M o d M a t i n e 2 3 0 V GB Maintenance manual for technical assistance...

Page 2: ...f faults Index Copyright LUIGI LAVAZZA S p A ESSEDI Manuali Tecnici Torino ITALY http www essedimanuali it E S P R E S S O P O I N T M o d M a t i n e 2 3 0 V GB Maintenance manual for technical assis...

Page 3: ...ESSO POINT MOD MATIN E 230 V Introduction Safety information Safety specifications Residual risks Environmental conditions allowed Warehousing Scrapping Transport List of tools necessary for maintenan...

Page 4: ...at hand Before leaving the factory this specific model was subjected to rigorous testing to ensure maximum reliability it should nevertheless be checked that the machine has not suffered any structura...

Page 5: ...r warnings he she could have an accident with serious consequences for himself herself and others Safety information is pointed out by the following signs Lavazza S p A cannot foresee all possible cir...

Page 6: ...stance LAVAZZA The Espresso Point machine must not be positioned in corrosive environment explosive or exposed to the atmospheric agents Keep the Espresso Point machine cleaned up from extraneous mate...

Page 7: ...he original packing or if impossible protecting it with nylon sheets to avoid the accumulation of dust Scrapping The scrapping happens at the end of the working cycle of the machine In normal conditio...

Page 8: ...native or additional tools of greater efficiency 1 Open ended 8 9 mm spanner 2 Open ended 10 11 mm spanner 3 Open ended 12 13 mm spanner 4 Standard pliers 5 PH2 Prehensile cross headed screwdriver 6 4...

Page 9: ...ing accessories are available on request which make maintenance on all ESPRESSO POINT machines easier Tool for fitting the chamber code 84960 Counter tank 79231 and resin filter 79255 or KIT 99231 FAP...

Page 10: ......

Page 11: ...COD 83192 REL 2 00 JANUARY 2003 ESPRESSO POINT MOD MATIN E 230 V 2 Technical information 2 1 Wiring diagram 2 2 Dosing control...

Page 12: ...ain switch F1 85071 Fuse 6 3 A S 85219 Plug fuse hold G 85065 Float G 87050 Float contact Technical information 9 T1 88046 Thermostat 130 T1 79226 Thermostat 130 Campini Technical information 10 T2 88...

Page 13: ...ESPRESSO POINT MOD MATIN E 230 V COD 83192 REL 2 00 JANUARY 2003 230 V 2 1 2 2 Technical information...

Page 14: ...with Programme 1 the jumpers are inserted in the housings on the card The tables below show approximate quantities delivered for each setting The machine operating conditions may be controlled by inse...

Page 15: ...nce operations 3 1 Delivery unit chamber maintenance 3 1 A Delivery unit chamber maintenance EASY C 3 2 Jaws maintenance 3 3 Steam jet maintenance 3 4 Light light holder maintenance 3 5 Softener and v...

Page 16: ......

Page 17: ...o screws as indicated Rotate the front section forwards extract it from its side slots then lift and position on the tank Caution Before beginning maintenance operations remove the electric plug Never...

Page 18: ...rear panel by loosening the four screws shown in the figure Extract and remove the water tank Caution Before beginning maintenance operations remove the electric plug Never start the machine during th...

Page 19: ...rew and remove the central nut D Unscrew and remove the 6 B screws and the two C screws after having removed the two respective locking nuts under the FAP press cover Caution To carry out the operatio...

Page 20: ...he spanner as shown in the diagram pushing it upwards and manually extracting the pipe By lifting the top plate it is possible to reach the labyrinth in order to carry out the cleaning operations and...

Page 21: ...onnected to the plate Unscrew and remove the solenoid valve from the plate To isolate the FAP press cover unscrew and remove the four screws B To isolate the chamber use a pair of pliers and firstly u...

Page 22: ...ice and by a 25 mm socket spanner unscrew the blocking nut 20 Extract the membrane 22 To reassemble the chamber place the F A P PRESSER 26 and the spring 24 in its seat paying particular attention to...

Page 23: ...noid valve Unscrew and remove the 6 B screws and the two C screws after having removed the two respective locking nuts under the FAP press cover Caution To carry out the operations the machine must be...

Page 24: ...the spanner as shown in the diagram pushing it upwards and manually extracting the pipe By lifting the top plate it is possible to reach the labyrinth in order to carry out the cleaning operations and...

Page 25: ...ted to the plate Unscrew and remove the solenoid valve from the plate To isolate the FAP press cover unscrew and remove the four screws B To isolate the chamber use a pair of pliers and firstly unhitc...

Page 26: ...device and by a 25 mm socket spanner unscrew the blocking nut 20 Extract the membrane 22 To reassemble the chamber place the F A P PRESSER 26 and the spring 24 in its seat paying particular attention...

Page 27: ...am from their slots using pliers Unscrew and remove the four screws indicated in the cup compartment Lift the heating unit and extract the container sliding base with the jaws First carry out the oper...

Page 28: ...RESSO POINT MOD MATIN E 230 V COD 83192 REL 2 00 JANUARY 2003 3 3 1 1 Steam jet maintenance Use a pair of pliers to unscrew the grained ring indicated in the diagram and remove the complete jet elemen...

Page 29: ...k and replace the bulb B rotating it in a clockwise direction To remove the light holder it is necessary to withdraw the two white wires C and D Unscrew completely the ring nut E and remove the light...

Page 30: ...ESPRESSO POINT MOD MATIN E 230 V COD 83192 REL 2 00 JANUARY 2003 Page left intentionally blank...

Page 31: ...schedule 3 B Rear part preliminary maintenance operations Slightly lift the sheet metal section A and remove the softener from its seat Depending on the hardness of the water and the amount of use per...

Page 32: ...from the pump as indicated in the diagram When assemblying make sure that the pipe forms a complete ring behind the pump and is not pinched as shown in the figure Remove the dosing device from its bra...

Page 33: ...t preliminary maintenance operations Note Before proceeding to the pump substitution or maintenance it is firstly necessary to disassemble the softener as previously described Disconnect the two pump...

Page 34: ...N E 230 V COD 83192 REL 2 00 JANUARY 2003 Extract the complete pump from the machine Unscrew the pipe fitting A from the pump and extract the seal Remove the two support braces shown in the figure 2 3...

Page 35: ...s described in schedule 3 B Rear part preliminary maintenance operations Remove the pod drawer from the front part of the machine Unscrew and remove the two self locking nuts shown in the diagram Remo...

Page 36: ...lace any fuses inside the plug B 6 3 Amp re Unhook the two feed wires and the three terminal boards with relative wiring from the electronic card as shown in the figure Unscrew the two self locking nu...

Page 37: ...COD 83192 REL 2 00 JANUARY 2003 ESPRESSO POINT MOD MATIN E 230 V In the event of faults 4 In the event of faults...

Page 38: ...e harness 2 Replace the contanct float if necessary 4 1 7 In the event of faults When switching on the machine all the lights of the front panel remain off The machine fails to come on 1 Check for pow...

Page 39: ...place the damaged thermostat or both if necessary 1 Replace the defective component The electronic keyboard or its flat cable are damaged The electronic card is defective 1 Replace the card In the eve...

Page 40: ...flash The solenoid valve is faulty and prevents the passage of water The electronic card is defective 1 Replace the solenoid valve 1 Replace the card The microswitch is defective The mechanical conne...

Page 41: ...is not obtained The unit is clogged by scale 1 Open the hydraulic circuit dismantling the output unit Clean the labyrinth chamber and the clogged pipes 2 Replace any parts that cannot be cleaned 3 Alw...

Page 42: ...used pods in excess dropped inside The FAP press remains lowered The solenoid valve fails to discharge The stainless steel spring in the chamber is broken 1 Replace the faulty solenoid valve 2 Replace...

Page 43: ...between the chamber and the integral teflon coated plate Presence of scale Membrane damaged on the seal with the collar of the teflon coated plate If the leak occurs between the integral teflon coate...

Page 44: ...leak occurs on the pump The nut is insufficiently tightened on the pump connection The 0 ring seal present in the connection is damaged The pump entry pipe is not correctly fitted and it is blocked b...

Reviews: