LAVAZZA LB 4200 Fast Manual Download Page 1

Fast guide. Instructions for the user -EN-

rev 03 - 03/2016 - cod. WY02000580

LB4200   

coffee - coffee

Preparation of the water tank

•  Turn the key and open the tank door 

(1)

;

•  extract the tank from its housing;
•  carefully wash the tank with lukewarm water;
•  install the new filter 

(A)

;

•  fill the tank with potable water;
•  properly insert the tank into the seat and close 

the door with the key.

For subsequent filling with water, it is not 

necessary to remove the tank from its seat;

Coffee delivery

•  Put the coffee cup under the dispensing 

spout;

•  lift the lever of the unit 

(2)

 and insert a 

LAVAZZA BLUE pod;

•  lower the lever of the unit;
•  press the desired dose button (e.g.

): 

and wait for coffee to be delivered (the LED 
comes on);

•  to stop the delivery of coffee in advance, 

press the delivery button again (e.g.

or 

;

In case of use of small cups, the cup raising 

grille is available 

(14)

.

Dispensing hot water

•  Place the jug under the hot water nozzle 

(7)

;

•  turn the tap knob 

(4)

 counterclockwise: the 

hot water coming out will be proportional to 
the opening of the tap;

•  to interrupt the steam dispensing turn the 

knob counter-clockwise 

(4)

.

Steam dispensing

•  Immerge the steam nozzle 

(8)

 in the liquid 

to be heated;

•  turn the tap knob 

(3)

 counterclockwise: the 

hot steam coming out will be proportional to 
the opening of the tap;

•  to interrupt the steam dispensing turn the 

knob counter-clockwise 

(3)

.

For optimal foaming, it is recommended to 

observe the following simple rules:
•  Heat only the amount of milk that you intend 

to use (DO NOT use already heated milk 
several times);

•  the milk to be foamed must have a starting 

temperature of 4°C.

Start-up

•  Connect the machine to the power supply by 

pugging the power cord; 

•  Turn the switch ON 

(9)

;

•  the automatic filling of water in the boiler and 

the dispenser unit heating are activated when 
the machine is switched on;

•  when the filling of water in the boiler has 

finished the services boiler heating phase 
starts, indicated by the sequential flashing of 
the LEDs of the keys;

•  wait for the coffee machine to warm up 

completely, indicated by the lighting of the 
LEDs 

(5)

.

•  position a large pitcher under the spout;
•  lift and lower the lever of the unit;

•  after dispensing 5 times, the first washing stage will end, the LED of button 

(6)

 

keeps flashing;

•  check that the unit lever is closed, 

then press button 

(6)

 again within 

10 seconds to start the process, the 
corresponding LED flashes;

•  press button 

(6)

 again;

•  wait for the performing of the rinse 

indicated by the flashing of button 

(6)

 LED.

•  at the end of the procedure, the boiler temperature will be restored (see Heating 

up the machine).

Washing

Perform unit washing.

The led of button 

(6)

 of the unit that 

requires the wash flashes quickly.

•  press and hold button 

(6)

 for 5 

seconds, the corresponding LED 
goes off;

WASH

PROGRAM

WASH

PROGRAM

WASH

PROGRAM

WASH

PROGRAM

WASH

PROGRAM

WASH

PROGRAM

Heating up the machine

Flashing from LH to RH

Machine ready: all the LEDs are on.

WASH

WASH

STOP

PROGRAM

STOP

PROGRAM

WASH

WASH

STOP

PROGRAM

STOP

PROGRAM

A

1

2

2

4

7

5

3

8

9

10

14

1 L

ong c

off

ee

2 L

ong c

off

ees

1 Medium c

off

ee

1 Espr

esso

2 Espr

essos

2 Medium c

off

ees

Contin

uous c

off

ee

Reviews: