
Fast guide. Instructions for the user -EN-
rev 03 - 03/2016 - cod. WY02000580
LB4200
coffee - coffee
Preparation of the water tank
• Turn the key and open the tank door
(1)
;
• extract the tank from its housing;
• carefully wash the tank with lukewarm water;
• install the new filter
(A)
;
• fill the tank with potable water;
• properly insert the tank into the seat and close
the door with the key.
For subsequent filling with water, it is not
necessary to remove the tank from its seat;
Coffee delivery
• Put the coffee cup under the dispensing
spout;
• lift the lever of the unit
(2)
and insert a
LAVAZZA BLUE pod;
• lower the lever of the unit;
• press the desired dose button (e.g.
):
and wait for coffee to be delivered (the LED
comes on);
• to stop the delivery of coffee in advance,
press the delivery button again (e.g.
)
or
;
In case of use of small cups, the cup raising
grille is available
(14)
.
Dispensing hot water
• Place the jug under the hot water nozzle
(7)
;
• turn the tap knob
(4)
counterclockwise: the
hot water coming out will be proportional to
the opening of the tap;
• to interrupt the steam dispensing turn the
knob counter-clockwise
(4)
.
Steam dispensing
• Immerge the steam nozzle
(8)
in the liquid
to be heated;
• turn the tap knob
(3)
counterclockwise: the
hot steam coming out will be proportional to
the opening of the tap;
• to interrupt the steam dispensing turn the
knob counter-clockwise
(3)
.
For optimal foaming, it is recommended to
observe the following simple rules:
• Heat only the amount of milk that you intend
to use (DO NOT use already heated milk
several times);
• the milk to be foamed must have a starting
temperature of 4°C.
Start-up
• Connect the machine to the power supply by
pugging the power cord;
• Turn the switch ON
(9)
;
• the automatic filling of water in the boiler and
the dispenser unit heating are activated when
the machine is switched on;
• when the filling of water in the boiler has
finished the services boiler heating phase
starts, indicated by the sequential flashing of
the LEDs of the keys;
• wait for the coffee machine to warm up
completely, indicated by the lighting of the
LEDs
(5)
.
• position a large pitcher under the spout;
• lift and lower the lever of the unit;
• after dispensing 5 times, the first washing stage will end, the LED of button
(6)
keeps flashing;
• check that the unit lever is closed,
then press button
(6)
again within
10 seconds to start the process, the
corresponding LED flashes;
• press button
(6)
again;
• wait for the performing of the rinse
indicated by the flashing of button
(6)
LED.
• at the end of the procedure, the boiler temperature will be restored (see Heating
up the machine).
Washing
Perform unit washing.
The led of button
(6)
of the unit that
requires the wash flashes quickly.
• press and hold button
(6)
for 5
seconds, the corresponding LED
goes off;
WASH
PROGRAM
WASH
PROGRAM
WASH
PROGRAM
WASH
PROGRAM
WASH
PROGRAM
WASH
PROGRAM
Heating up the machine
Flashing from LH to RH
Machine ready: all the LEDs are on.
WASH
WASH
STOP
PROGRAM
STOP
PROGRAM
WASH
WASH
STOP
PROGRAM
STOP
PROGRAM
A
1
2
2
4
7
5
3
8
9
10
14
1 L
ong c
off
ee
2 L
ong c
off
ees
1 Medium c
off
ee
1 Espr
esso
2 Espr
essos
2 Medium c
off
ees
Contin
uous c
off
ee