![Lava Heat PALERMO Owner'S Manual Download Page 7](http://html.mh-extra.com/html/lava-heat/palermo/palermo_owners-manual_680520007.webp)
Assemble the wheel kit.
Line up holes on the bracket of wheel kit with the correspond-
ing holes on base , then insert M8 x 14 mm bolts through
holes. Hand tighten with M8 flange nuts. Be sure the wheel
assembly is parallel to the base.
2. Assemble the cylinder housing. 2 Attach cylinder housing
to base with 5pcs M8 x 16 mm bolt and secured them.
Assemble the lower pole.
Put the lower pole onto the two bars on the cylinder. Line up
holes on the bracket of lower pole with the corresponding
holes on bars. Insert 4pcs M6X30 bolts through the holes and
secured them with 4pcs M6 nuts underneath.
ASSEMBLY INSTRUCTIONS
1
2
3
O
N
M
L
CC
EE
DD
AA
BB
CC
Bolt M8 x 16
x 5
DD
M6 Flange nut
x 4
AA
BB
x 2
Bolt M8 x 14
M8 Flange nut
x 2
EE
Bolt M6 x 30
x 4
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents above. If any part is missing or damaged, do
not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 60 minutes
Tools Required for Assembly (not included):
Phillips screwdriver w/ medium blade. Leak Detection Solution.
-5-