Base plate symmetric installation is as shown in 7d
1
:
With total width (A) as the basis, draw two parallel
lines (#1 and #2) on the concrete slab, with the error
within 3mm.Determine the power side column
location on any chalk line, and mark the total width (B)
of the base plate. Mark the points 3 and 4.Starting
from point 3, draw one diagonal line (C), forming a
triangle. In this way, the vertical lines can determine
the location of the two columns.
B
C
A
2#
1#
70mm
(2.76in)
3392mm(133.54in)
2582mm(101.65in)
3415.5mm(134.
47in)
2792mm(109.92in)
40
0m
m(
15
.7
5i
n)
4
3
Fig.7d
1
Base plate asymmetric installation is based on a total width
(A) shown in
7d
2
,
draw two parallel lines (#1 and #2) on
the concrete slab, with the error within 3mm.Determine a
point B at any point on chalk line #1, based on point B,
move down 131mm, then move right 228mm to get point C.
Based on point B, draw #1’s vertical line M with a length of
A to get point D .Based on point C, draw line M’s parallel
line N with a length of L to get point E. With four points
B,C,D,E, each post’s position can be decided.
E
D
C
B
2#
A
1#
13
1m
m(
5.
16
in
)
228mm
(8.98in)
228mm
(8.98in)
3544mm(139.53in)
3088mm(121.57in)
Fig 7d
2
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069