Starting up
7.1
Mains connection
Compare the rating on the nameplate (back of control head) with the mains voltage.
Connect unit only to sockets with a protective earth conductor (PE).
No liability is accepted for incorrect mains connections!
Ensure that pump connectors without external loads are closed off.
Ensure that the unit is filled according to Section 6.3.
Note for electric installation on site:
The devices must be protected with a 16 ampere circuit breaker fitted during installation.
Exception: Devices with 13 ampere UK plugs.
7.2
Switching on
Check whether the main fuse switch at the back is in the ‘On =
–
’ position.
Switch on the mains switch :
The green LED for ‘Mains ON’ is lit,
1 s
an acoustic signal is emitted for about 1 s.
The unit starts its self-test. All display segments and symbols appear for about
1 second.
The momentary bath temperature is displayed,
the pump starts provided ‘Standby’ or ‘Manual start’ (
Section 7.8.2) has
not been programmed,
all values are accepted which were active before switch-off.
Check or set overtemperature cut-off point:
The switching point is shown in the LED display on pressing the key
.
Change overtemperature cut-off (
Section 7.14.1) Overtemperature pro-
tection and checking on page 80.
If necessary, top up heat transfer liquid which has been pumped out by filling
the external load.
Self-test
88(((
°C
EXT
Bath temperature
02%32
°C
Overtemperatu. cut-off.
90
°C
Summary of Contents for PROLINE P 5 C
Page 13: ...02 2022 Proline heating thermostat 13 123 Clear view thermostat PVL 24 Bridge thermostat PB C ...
Page 113: ...02 2022 Proline heating thermostat 113 123 Pump characteristics measured with water ...
Page 114: ...114 123 Proline heating thermostat 02 2022 Pump characteristics measured with water ...
Page 115: ...02 2022 Proline heating thermostat 115 123 12 Declaration of Conformity ...
Page 118: ......
Page 119: ......