Alpha
23 / 54
6.2
Filling and Emptying
Filling
Close the drain nozzle.
Fill baths up to a maximum level of 20 mm be-
low the bath bridge.
Optimum operation at 20 – 40 mm below the
bath bridge.
Operation is possible down to 70 mm below the
bath bridge.
Low-level cut at about 80 mm below the bath
bridge!
(Protection testing (
Emptying
Switch off the thermostat, pull out the mains plug!
Drain the heat transfer liquid through the drain nozzle
using a flexible tube.
The units are designed for operation with non-flammable liquids to
DIN EN 61010-2-010
water or glycol/ water mixture.
When starting up the unit, the tubular heater has to be covered with liquid!
When connecting an external consumer take care of the heat transfer liquid level for it must not
decrease too much
fill in heat transfer liquid if necessary.
Do not drain the heat transfer liquid when it is hot or very cold (below 0 °C)!
Bath drain nozzle
Summary of Contents for Alpha
Page 2: ......
Page 4: ......
Page 14: ...14 54 Alpha 09 2020 j 1 Control head with clamp 2 Bath vessel 3 Four mounting feet 1 2 3 ...
Page 16: ...16 54 Alpha 09 2020 j 1 Mains cable 2 Rating label 3 Cooler cable 4 Bath drain nozzle 1 2 3 4 ...
Page 47: ...09 2020 j Alpha 47 54 Cooling characteristics Alpha RA 8 RA 12 and RA 24 230 V 230 V ...
Page 51: ...09 2020 j Alpha 51 54 intentionally left blank ...
Page 52: ...52 54 Alpha 09 2020 j intentionally left blank ...
Page 54: ...54 54 Alpha 08 2020 i ...
Page 55: ......