
Garage Assembly
Step 5. Remove main door foot rail and take door out.
Paint door and frames, figure 8. Next as you did with the
garage install the glass thru top door opening, next install
door and foot rail and install door, figure 9. Install interior
frame and make sure door opens freely. Figure 10.
Step 6. Glue even to the bottom floor the pillar stands as
seen in figure 11. Locate pillars and install the two pillar
caps onto the top and press down enough to get clearance
when installed onto pillar stands, figure 12, do not glue
caps. Check for good clearance.
Figure 8
Figure 9
Figure 11
Figure 12
Figure 10