EYM INSTALLATION / SEALING COMPOUND 

HAZARD WARNINGS:

 

May cause irritation to eyes and skin. Inhalation dust is considered a nuisance 

dust. Avoid physical contact by wearing appropriate gloves and dust goggles. If powder gets into eyes, 
flood immediately for 15 minutes with water. Wash hand thoroughly with soap and water after 
handling 

Mix 2 parts Sealing Compound to 1 part clean 
water. Mix thoroughly. Do not mix more than 
can be used in 15 minutes. Use cold water as 
warm water accelerates set. 

Vertical Installation: 

Seal  fitting  is  installed  with  the  small  access  plug  in  the 
up  position.  Both  access  plugs  are  removed  after 
conductors  are  installed.  Damming  fiber  is  installed 
through  the  lower  access  port  into  the  lower  portion  of 
the  fitting  body.  Care  must  be  taken  to  insure  the  fiber 
fills all voids around each conductor, as well as between 
conductors and the wall of the seal fitting body. Replace 
the  lower  (large)  access  plug.  Mix  compound  according 
to manufacturer instructions and pour through the upper 
(smaller)  access  port  until  compound  reaches  the  base 
of  the  access  port  threads.  Replace  remaining  plug  in 
upper  access  port.  Both  plugs  are  to  be  made  up  with 
five threads engaged and wrench tight. 

Horizontal Installation: 

Seal  body  is  installed  with  both  access  plugs  in  the  up 
position.  Both  access  plugs  are  removed  after 
conductors  are  installed.  Damming  fiber  is  installed 
through the  large  access port into  both ends of the seal 
fitting  body  to  allow  sealing  compound  to  flow  to  the 
required  thickness  (Table  A).  Care  must  be  taken  to 
insure  the  fiber  fills  all  voids  around  each  conductor,  as 
well  as  between  conductors  and  the  wall  of  the  seal 
body. 

Replace  the  small  access  port  plug.  Mix  compound 
according to manufacturer instructions and pour through 
the  large  access  port  until  compound  reaches  the  base 
of  the  access  port  threads.  Replace  large  plug.  Both 
plugs are to be made up  with five threads engaged  and 
wrench tight. 

Class I Group A & B Installations: 

Vertical Installation: 

Sealing  compound  is  to  be  mixed  at  ambient 
temperature  above  40°f.  /  4°c.  and  poured  into  fitting 
with  body  temperature  not  below  40°f.  /  4°c.  Ambient 
temperature  (of  fitting)  must  not  drop  below  40°f.  /  4°c. 
for  72  hours.  Compound  must  cure  for  72  hours  before 
circuits are placed into service. 

Horizontal Installation: 

Sealing  compound  is  to  be  mixed  at  room  temperature, 
and  poured  into  fitting  at  room  temperature.  Ambient 
temperature  of  fitting  must  remain  at  room  temperature 
for  72  hours.  Compound  must  cure  for  72  hours  before 
circuits are placed into service.

 

Class I Group C & D Installations: 

Sealing  compound  is  to  be  mixed  at  ambient 
temperature  above  35°f.  /  2°c.  and  poured  into  fitting 
with  body  temperature  not  below  35°f.  /  2°c.  Ambient 
temperature  (of  fitting)  must  not  drop  below  35°f.  /  2°c. 
for  8  hours.  Compound  must  cure  for  8  hours  before 
circuits are placed into service. 