LT-4200 User & Installation Manual Rev. 1.00
Installation and Mounting
Lars Thrane A/S
www.thrane.eu
Page 19 of 128
Pole Mount (2.0
” pipe, Ø
53.0mm, A4 Stainless), Antenna Unit
The Pole Mount (2.0
” pipe, Ø
53.0mm), Antenna Unit is illustrated in Figure 19 to Figure 20.
Pole mount installation procedure:
1.
Screw the pole mount onto the LT-4230 Antenna Unit using the Head screws (max torque = 12 Nm)
as illustrated on Figure 20
2.
The LT-4230 Antenna Unit and pole mount can now be m
ounted on the 2.0” pipe. Fasten the three
pole lock pinot screws, as illustrated in Figure 21 (max torque = 88 Nm)
3.
Feed the coaxial cable through the supplied cable hose
4.
Fasten the coaxial cable to the LT-4230 Antenna Unit (N connector)
5.
Apply self-volcanic tape on the N connector and cable to protect against saltwater and corrosion
NOTE
:
The Pole Mount (2.0
” pipe), A
ntenna Unit interfaces to a pipe of maximum 2.0
” (
53.0 mm),
measured outer diameter.
Figure 19: Pole Mount (2.0
”
pipe), Antenna Unit.
Summary of Contents for Iridium Certus 200
Page 2: ......
Page 140: ......
Page 141: ...Lars Thrane A S Skovlytoften 33 2840 Holte Denmark www thrane eu...