LARS LAJ 11346 Manual Download Page 7

Installation manual

7

11346

1. Choose place for the post [1] remembering about safety area. 
2. Using a pattern, mark tracks of foundation bars [2], pattern protect by nuts M22 [9]. 
3. Using flat bars [3] mark places for the foundations [5].
    Mark places for middle foundations [6], that are in the middle of length - measuring in straight line - 
    between the foundations [5]. Use a flat bar [4] to mark foundations [6].
    Foundation bars [2] have to go into flat bars holes. This will guarantee  right postions of the foundations.. 
4. Dig holes for foundation bars [2]  and foundations [5] & [6].
    Before concrete foundations protect them against movement and using flat bars make sure they are in right place  
    WARNING! Main post foundation [1] can’t be lower than foundations  [5] & [6].
5. Place the concrete in foundations [1], [5], [6] and wait untill solidified. 
6. Install post [1] (description on the next page) and regulate tension of the opposite ropes with a turnbuckle
 (as tight as possible, keeping vertical position of the post) use nut [7] and then regulate by tension element
on the top of post, description on the page number 6
(use tension element as less as possible to keep possibilty to regulate in future tension of the ropes).
7. After tension the ropes cut the bolt in anchors to nut height. 

[2]

[5]

[3]

[4]

[5]

[3]

[4]

[6]

[5]

[1]

[5]

[5]

[6]

[2]

INSTALLATION ON GROUND

[7]

[9]

Summary of Contents for 11346

Page 1: ...m Critical Falling Height 90 cm Requires falling surface YES Age level 5 years Acc To En 1176 YES Spareparts available YES The number of users in the same time max 10 users 601 cm 520 cm 820 cm 386 cm...

Page 2: ...ensions 601x520 cm Fax Safety Zone 901x820 cm Email Age Level 5 years Product Photo Picture OWNERS DATA Name Contact Address Zip code city Place Phone Fax Email AREA DATA ADMINISTRATOR DATA Placing Na...

Page 3: ...ion of construction elements checking loose clips elements joining two ropes and adjusting if needed ANNUAL INSPECTION checking the tension of the ropes and adjusting if needed checking the condition...

Page 4: ...Technical Maintenance 4 11346...

Page 5: ...Technical Maintenance 5 11346...

Page 6: ...Product main dimensions 6 11346...

Page 7: ...5 6 Before concrete foundations protect them against movement and using flat bars make sure they are in right place WARNING Main post foundation 1 can t be lower than foundations 5 6 5 Place the conc...

Page 8: ...e 13 cm Ground level 300 500 A A 1 15 Post 5 INSTRUCTION 1 After mount threaded rod M22 1 and when the concrete solidified install nut M22 2 2 Install fixing element 3 and leveled by nut M22 2 under f...

Page 9: ...n element on the post 2 Ropes tension by the bolts M22 3 and M10 6 3 During tension ropes by bolts M10 6 remember to do evenly each bolt M10 6 4 After tension ropes screwed bolts M10 8 and nuts M10 7...

Page 10: ...Installation manual 10 11346 SOIL 60 cm 50 cm concrete Sand Gravel Bark min 30cm concrete 50 cm SOIL 50 cm 60 cm...

Page 11: ...Installation manual 11 11346 SOIL 60 cm 50 cm Safety surface min 30cm concrete or concentrated surface SOIL 60 cm SOIL 60 cm SOIL 50 cm concrete concrete 50 cm SOIL 50 cm safety surface min 30cm...

Reviews: