background image

Sona installation manual v2.0 

- 5 -

Sona installation manual v2.0 

arch frame

PCS

199-101

Button plate

PCS

199-017

Plate

PCS

199-024

EAO Button

PCS

100-112

EAO Bazel

PCS

100-113

Hinge tube

PCS

199-065_C

FunkyFloor

PCS

199-501

Speaker JBL

PCS

100-107

Sona YIN box

PCS

100-102

electronics board

PCS

199-310

Polyester cap

PCS

199-401

Hinge cap

PCS

199-002_C

polyester clamp

PCS

199-221

2

Installation mould

PCS

199-599

Parts - Sona

Grey parts are pre-installed

1

1

1

1

1

16

1

1

1

1

1

2

2

Summary of Contents for SONA

Page 1: ...May 28 2013 Sona installation manual v2 0 1 Sona installation manual v2 0 ...

Page 2: ...oduct Introduction Lappset InterActive Competence Center T 0031 547 289 410 E interactive lappset com 2 Introduction Contents 3 Preparation Tools list Attention 4 Sona isometric view 5 Parts Sona 6 Parts Mounting 7 Dimensions 8 Foundation 10 Funky floor on tiles 11 The arch 12 Polyester caps 13 The hinge cap 14 Electronics 15 Closing up 16 Finishing touch 17 Maintenance 18 Angry Birds version part...

Page 3: ... 50m of nearest housing facade Rule of thumb Sona with sound level on 5 is not audible at nearest house Do not place the Sona within fastly moving shadows For example near flag poles tree braches etc Shadows may interfere with the game play Make sure the play area receives a sufficient amount of light Outdoor ambient light is sufficient Indoor good light conditions are necessary for the camera to ...

Page 4: ...Sona installation manual v2 0 4 Sona isometric view ...

Page 5: ...O Bazel PCS 100 113 Hinge tube PCS 199 065_C FunkyFloor PCS 199 501 Speaker JBL PCS 100 107 Sona YIN box PCS 100 102 electronics board PCS 199 310 Polyester cap PCS 199 401 Hinge cap PCS 199 002_C polyester clamp PCS 199 221 2 Installation mould PCS 199 599 Parts Sona Grey parts are pre installed 1 1 1 1 1 16 1 1 1 1 1 2 2 ...

Page 6: ...S 100 231 Hex nut M16 PCS 100 277 Hex nut M8 PCS 100 276 Hex bolt M8x20 PCS 100 240 Hex bolt M10x50 PCS 100 245 Hex bolt M8 x 40 PCS 100 243 Washer M10 PCS 100 282 Washer M8 PCS 100 281 Washer M16 PCS 100 284 Hex bolt M8x35 PCS 100 247 Rope PCS 100 508 Transparent sealant PCS 100 507 Parts Mounting 1 1 6 12 6 16 12 12 3 1 24 1 3 16 12 ...

Page 7: ...Sona installation manual v2 0 7 3782mm 149in 940mm 37in 4965mm 195in 4000mm 157in 4 5 0 0 m m 1 7 7 i n 4 5 0 0 m m 1 7 7 i n 3800mm 150in Dimensions ...

Page 8: ...00mm 27 5i 270mm 10 6in 350mm 13 8in Parallel 700mm 27 5in 270mm 10 6in 350mm 13 8in DETAIL A Installation mould PCS 199 599 Hex nut M16 PCS 100 277 Washer M16 PCS 100 284 Foundation 1 Put the anchor bolts in the concrete foundation Use the installation mould for positioning Get the power cable in place 2 Put funky floor on top and add sand 12 12 1 1 6 ...

Page 9: ...m 28in DETAIL M SCALE 1 25 1300mm 51 700mm 28in 600mm 24in 700mm 28in Power cable 1 5m above ground Concrete Anchor bolts x3 270mm 11in 700mm 28in 350mm 14in 395mm 16in 542mm 21in 1300mm 51in 700mm 28in DETAIL M SCALE 1 25 1300mm 51in 700mm 28in A M 1300mm 51in anchor bolt M16 PCS 100 231 FunkyFloor PCS 199 501 1 Foundation Make sure the power cable has at least 1 5m over length ...

Page 10: ...e 4 5x4 5m Install concrete borders to set off the play area of 4 5x4 5m 14 7 ft Create a pleateau of tiles within that is approximately 2cm below ground level If you use tiles make sure these are installed upside down for minimal seams Install the Funky Floor on the plateau pull the edges over the concrete borders and lock them by putting them at least 15cm 6inch vertically into the ground ...

Page 11: ...100 277 Hex bolt M10x50 PCS 100 245 Washer M10 PCS 100 282 Washer M16 PCS 100 284 3 Put the arch frames up on top of the anchor bolts A Make sure the power cable goes through the foot at the side of the 2 on the floor 4 Connect the arches at the top B The arch Mount bow on top of anchors in concrete floor using 100 275 and 100 283 both 6x Do not tighten yet Connect the arches together with 100 245...

Page 12: ...steel frame with the polyester clamps 199 221 and bolts 100 243 washers 100 281 Use a power drill to drill holes in the top of the polyester caps on the inside and secure them with bolt 100 240 and nut 100 276 to the steel frame Install polyester caps 199 401 After installing the caps tighten all the bolts in the arch 5 Install the polyester caps in place 6 Mount the polyester caps to the steel ar...

Page 13: ... DETAIL C1 SCALE 1 10 C3 DETAIL C3 SCALE 1 10 Hex bolt M8x35 PCS 100 247 The hinge cap 7 Insert the hinge cap into the arch Lock it with the bolt and secure it with a rope Step 1 Slide part 199 065 on the axis of 199 002 Step 2 Insert the assembly in the arch Put the fixed end of the axis in first Step 3 Slide part 199 065 back through the hole on the opposite side and lock it in place with bolt 1...

Page 14: ...In top of bow On mountingplate 12 V STANDBY AUDIO OUT AUDIO IN Electronics Cable 1 main computer cable Cable 2 sound cable out Cable 3 Cable to speaker on other side 8 Connect the power cable to by EN1010 certified installer the CEE plug socket Connect the plug 9 Connect other cables picture Button power to the top audio cables Check the electronics See schematic view below as a check ...

Page 15: ...508 Closing up 10 Close the cap Connect the rope for safety and use bolts 100 213 to close up Make sure cables do not get between the axis 11 Close the sides with 199 017 button on hinge side and number 2 side and 199 024 cap Close up with bolts 100 213 Secure rope to cap and in top of Sona Connect the button to the electronic box in the Sona 20 1 1 1 4 ...

Page 16: ... 16 13 Now Sona is ready to play Look in the product manual how to get it online and do all settings Let s play 12 Close the top gap with transparent sealant to make Sona watertight Finishing touch Transparent sealant PCS 100 507 1 ...

Page 17: ...by using regular car wax and polish products Keep camera hole clean of cobwebs or other kind of debris The Funky floor is filled with quartz sand Sweep the sand is swept away due to intensive use sweep it back with a broom If the filling sand is lost replace it with quarts sand washed and dries with a dimension of 0 2 and 1 0 mm ...

Page 18: ...top of the Sona The polyester caps are a special version with circle cutouts for the foot flange The playfloor has a different design and is delivered in the package Bolt secured M10x30 PCS 100 213 Polyester cap AB PCS 199 402 AB foot flange PCS 199 610 AB figure PCS 904803 Torque Nut M10 PCS 100 274 Hex bolt M10x50 PCS 100 245 Washer M10 PCS 100 282 Angry Birds version parts 1 1 4 2 2 4 2 ...

Page 19: ...e arch AB foot flange PCS 199 610 E Torque Nut M10 PCS 100 274 Hex bolt M10x50 PCS 100 245 Washer M10 PCS 100 282 Angry Birds version installation Slide down flange 199 610 on the Sona construction Bolt shut with 100 254 2x 100 274 2x and 100 282 4x Make sure the power cables go through the middle hole and do not get stuck Detail E 1 4 2 2 ...

Page 20: ...n manual v2 0 20 AB2 Bolt the AB figure in place with 100 213 4x Caution Do not use electric machine Bolt secured M10x30 PCS 100 213 AB figure PCS 904803 F SONA ANGRY BIRDS Angry Birds version installation Detail F 1 4 ...

Page 21: ...Sona installation manual v2 0 21 AB3 Cover the AB Sona with the special polyester caps with cutout for the foot flange Polyester cap AB PCS 199 402 Angry Birds version installation 2 ...

Page 22: ... Lappset components The inspection of delivery has to be done before installation and possible damages have to be informed immediately The delivery time for spare parts is one week from the factory 4 Application of warranty Warranty will only apply under the condition that the product has been installed and maintained correctly according to the instructinos administered by Lappset 5 Exclusion of w...

Page 23: ...Sona installation manual v2 0 23 Safety certificate ...

Page 24: ...e social responsibility means that Lappset takes responsibility on the core themes of ISO 26000 in the economic profit environmental planet and social people These themes run like a red line through the organization Lappset shows his professionalism and appreciation for the company through the necessary certificates if they are available in this area The best information is not delvered by the mea...

Reviews: