11
Chapter 3 Hardware Installation
Hardware installation
1. Unpack the Industrial switch
2. Check if the Rack mount brackets are screwed on the Industrial switch or not. If the
Rack mount brackets are not screwed on the Industrial switch, please refer to
Rack
Mounting
section for rack installation.
3. To install the Industrial switch in a 19 inch Rack.
4. Power on the Industrial switch. Please refer to the
Wiring the Power Inputs
section
for knowing the information about how to wire the power. The power LED on the
Industrial switch will light up.
5. Prepare the Category 6 cable for Ethernet connection.
6. Insert one side of category 6 cable into the Industrial switch Ethernet port (X-code
port) and another side of RJ-
45 cable to the network device’s Ethernet port, ex:
Switch PC or Server. The LNK/ACT LED on the Industrial switch will light up when
the cable is connected with the network device. Please refer to the
LED Indicators
section for LED light indication.
7. When all connections are set and LED lights all show in normal, the installation is
complete.
Summary of Contents for TPGS-L6408XFTR
Page 15: ...14 Plug power connector and screw in clockwise direction to fix it...
Page 19: ...18 Plug 10G connector and screw in clockwise direction to fix it...
Page 22: ...21...
Page 24: ...23 Multiple Rings...
Page 25: ...24 Dual Homing...
Page 26: ...25 Chain...
Page 27: ...26...