
LanReady
Technologies
Inc.
3F.,
No.166,
Sinhu
2nd
Rd.,
Neihu
District,
Taipei
City
114,
Taiwan
Tel:
886
‐
2
‐
2796
‐
8188
Fax:
886
‐
2
‐
2796
‐
8158
http//:www.lanready.com
Network on Demand Network on Demand Network on Demand Network on Demand Network on Demand
Wrap the included two plastic mounting ties to the pole.
2B: Wall Mounting
It is an optional accessory and fix it on the wall with screws and then attach the device
and use the plastic mounting ties to hold in place.
STEP 3: Connect Grounding Wire
A grounding wire is recommended to protect your device from lightning strikes and the
buildup of static electricity.
-
A grounding Wire is not included in the package. It is suggested that you use 16 to 18 AWG grounding wire.
STEP 4: Connect the AP to Your Network
A. Connect the Ethernet cable (connected to the AP in STEP 1) from the AP to the
“
P+DATA OUT
"
port on the PoE Injector.
B. Connect an Ethernet cable from a router/ switch or PC to the
“
DATA IN
"
port on
the PoE Injector.
C. Attach the power adapter to the connector labeled
“
POWER IN
"
on the PoE
Injector, and attach it into an electrical outlet.
Configuration
If you are configuring the AP locally, connect a PC to the PoE Injector
“
DATA IN
"
port using an Ethernet cable.
A. Assign a static IP address to your PC which is in the same network segment with
the device. As the default IP address of this unit is 192.168.2.254.
B. Open a web browser and go to http:// 192.168.2.254. Enter “root” as your
username and enter “default” as the password to log into the web UI. Now you can
configure the AP via web UI.