![Lanner NCA-5230 User Manual Download Page 34](http://html1.mh-extra.com/html/lanner/nca-5230/nca-5230_user-manual_3654242034.webp)
NCA-5230 User Manual
34
1.
This slide-rail kit does NOT require
screw-fixing. Aim at
3
available
screw holes on the rack front and
lock it by clipping the rail
’
s front end
to the post, as shown in the image
below. You should hear a
“click”
sound once it is firmly attached.
2.
For the rear rack installation, slide
the rail to aim and engage the bolts
on the rail
’
s rear end with the
2
available holes on the post, and the
rail assembly will click into place.
3.
Repeat Step 1~2 to install the other
rail onto the post.
1.
Stretch both of the inner channels
out to their fullest extent. You will
hear a click sound when they are
fully stretched and locked.
Click
Click
Click
The inner channel will
click when it is fully
stretched.
Use this clamp
to fix the rail
front onto the
post.
Click
Front Post
Rear Post
Summary of Contents for NCA-5230
Page 1: ...NCA 5230 User Manual Version 1 0 Date of Release 2022 06 14 Network Appliance Platform...
Page 41: ...NCA 5230 User Manual 41...
Page 49: ...NCA 5230 User Manual 49...
Page 58: ...NCA 5230 User Manual 58...
Page 63: ...NCA 5230 User Manual 63...
Page 71: ...NCA 5230 User Manual 71...
Page 73: ...NCA 5230 User Manual 73...