Lange Originals HOIST-A-TOP JT CRANK Manual Download Page 13

Balancing and attaching the frame

With your frame assembled (Fig. 1-

8

) lay it on the floor directly below the cables with the top of the “T”

 

Frame facing your garage door. Insert one thimble (HDW-031) on the rear most hole on the lifting blade

 

(HAT-100). Insert the other thimble (HDW-031) on the tab on the front of the “T” Frame (HAT-100).

Thimble

Lifting Blade

THIMBLE

Thimble

Fig. J

As shown in Fig. K, feed the cable through the hole with the thimble, install cable clamps loosely at first, in

order to balance the frame. With the frame level on the floor pull the cable taut and secure the cable

clamps in the order shown in figure K. Be careful to not over tighten these as they will strip. If they do

become stripped or are suspect do not use them, they can be inexpensively obtained at any hardware

store. Inspect these and all hardware before each use.

Fig. K

Fig. L

Now that the frame is preliminarily balanced, it also needs to be balanced on your hardtop.

Make sure that all the torque bolts in the top, latches, windshield fluid tube, and wiring harnesses are

disconnected before lifting.

Put your Hoist-A-Top frame on the hardtop of your Jeep, and attach the rear hook assembly (HAT-139/140).  

The two J hooks (HAT-003) in the front should grapple underneath the hard top just before the corner where 

the window goes. The foam supports are designed to have the interior side of the freedom top pieces facing 

up on the same side from where they were removed. The bungee cords hook from the grommet straps 

(HAT-110) to any free hole in the lifting blade, holding the top panels in place. Final leveling of the hard top 

is achieved by loosening the cable clamps and removing some slack from the dipping side. Do this until the 

top is parallel to the ceiling. This is a trial and error basis and takes some fiddling, but you only have to do it 

once. When you are satisfied that the top is level, inspect and tighten all cable clamp bolts.

Summary of Contents for HOIST-A-TOP JT CRANK

Page 1: ...LANGE ORIGINALS HOIST A TOP JT CRANK Call toll free 1866 284 7428 langeoriginals com copyright lange originals 2017...

Page 2: ...in your wall and ceiling Wire clamps must be checked and ghtened regularly Do a dead weight li to ini ally test your installa on Upon li ing your top for the rst me and subsequent mes therea er visua...

Page 3: ...34 HAT 019 Rear Stabilization Arm Black Round Foam 4 Zip Ties for Foam Foam arms T Foam Bungee cord 2 1 1 2 Hardware Parts Bag 3 2 14 14 6 2 2 2 HAC 028 HAC 015 HAT 050 HAT 125 HAC 043 HAT 054 HAC 023...

Page 4: ...unt it to your back wall using at least 4 screws HAT 050 You will want this at comfortable working height approximately 50 inches above the oor 3 Mount your crank unit to the 2x6 centered with your ha...

Page 5: ...ng 3 5 screws HAT 050 to place cross bracing 2x6 2 With the 1 5 screws HAT 125 provided mount the double pulley HAT 118 and one of the single pulleys HAT 116 centered with the crank unit and hardtop 3...

Page 6: ...the double pulley HAT 118 The distance between the double pulley and the first single pulley can be custom to your garage 3 With the 1 5 wood screws HAT 125 a ach both single pulleys HAT 116 on the 2x...

Page 7: ...pulley can be installed on the wall or ceiling This pulley is inch of center Aprox 50 inches Longer cable side of crank drum Call toll free 1866 284 7428 langeoriginals com copyright lange originals...

Page 8: ...from the double pulley to the two singles Fig A 2 note the distance from the wall to the jeep is optional but a minimum of 4 feet is recommended see Fig B 3 Wire your crank unit through the pulleys an...

Page 9: ...the J Shaped hooks HAT 003 through the holes found on each end of the front support arms HAT 101 Place one hole of the grommet strap HAT 110 around the threaded part of the J Shaped hook HAT 003 Secu...

Page 10: ...Fig 3 front settings on frame JT 4 Door Setting JT 4 Door Setting JT 4 Door Setting Long Foam Supports Fig 4 Underside look at the correct place ment of the rear arm...

Page 11: ...uld be assembled in steps after frame is assembled and needs to be fitted with care through window Fig 6 Showing the frame fully assembled through the rear window Fig 8 Lacing the wire ties into the f...

Page 12: ...care that the cables don t cross and that the long side stays on the left pulley and the shorter side stays on the right Pull the side cable the shorter cable through the middle single pulley in the c...

Page 13: ...ow that the frame is preliminarily balanced it also needs to be balanced on your hardtop Make sure that all the torque bolts in the top latches windshield fluid tube and wiring harnesses are disconnec...

Page 14: ...re registered trademarks of FCA US LLC ALFA ROMEO and FIAT are registered trademarks of FCA Group Marketing S p A 2018 FCA US LLC All Rights Reserved WARNING This product can expose you to bisphenol a...

Reviews: