Landustrie version 06-12 | operation & maintenance manual DWP & DNP-EX series
Subject to modifications
6 / 16
Installation
“VRS”
This installation represents a permanent freestanding submerged installation.
Points of attention:
Ensure a good free passage under the pump, at least identical to the suction opening.
Adjust start- and stop levels in such a way that the motor will not make more than 20 starts
per hour
and so that the volute and seals are always submerged
!
The level regulation should be intrinsic save with safety level of a least SIL1
.
Check that the motor is adequately cooled.
At full load conditions, at least 2/3 of the motor housing should be submerged.
Installation
“ODO”
This installation represents a dry installation where the pump is equipped with a cooling system.
Points of attention:
The discharge- and suction flanges should be exactly in line with the piping system.
This installation may not create forces on the discharge- and suction flanges.
Check the cooling system regularly for blockages.
To do this, therefore the cooling jacket must be taken off.
The bolts ad nuts on top of the cooling jacket, or suspension bracket must be reconnected.
Prior to inspection, close the valves in discharge and suction pipelines!
Adjust start- and stop levels in such a way that the motor will not make more than 20 starts
per hour
and so that the volute and seals are always submerged
!
The level regulation should be intrinsic save with safety level of a least SIL1
.
Hoisting device:
De submersible pumps can be (re-)installed in the sump by means of an
adequate hoisting device.
Landustrie is able to deliver this certified equipment.
Hoisting cable:
If applied, please replace the stainless steel hoisting cable every two years, or
accordingly to local regulations.
min. level
min. level