G200 Analyser Range
OMG200N1.23
©
Copyright 2010 Geotechnical Instruments (UK) Limited
Page
25
Flow Fail Set-up Process – Best Practice:
Make sure that you have carried out the Preliminary Checks Best Practice before
commencing the Flow Fail Set-up. Refer to Section 6.1 for more information.