![L&T Electrical & Automation GIS DS30 1250A Operation & Maintenance Manual Download Page 52](http://html.mh-extra.com/html/landt-electrical-and-automation/gis-ds30-1250a/gis-ds30-1250a_operation-and-maintenance-manual_664495052.webp)
the excess pressure to pass through the regulator into the
equipment. Then restart the GFU10.
HINT:
To speed charging, keep the vessel you are drawing gas
from warm. This applies to the onboard tank or external vessel.
FINISH FLOOR
LEVEL
FRONT VIEW
MANDATORY SPARES
Operation & Maintenance Manual
11
Figure -1 : Showing Arrangement of panels with SF6 gas inlet valve
Figure -2 : Showing di erent positions on Manometer
Figure - 2B
Figure - 2A
Figure - 2C
#