background image

 

 

page  4

 

P 800.521.2546  F 269.381.3455  www.landscapeforms.com 

7.  Connect the  solar panel to the power 

unit using the MC4 connectors .   

 
8.  Plug the luminaire into the LED     

driver(s) using the weatherproof con-
nectors. 

 

 

All electrical connections are complete at 
this point. 

 

9.  Switch the circuit breaker to the on 

position by pushing the plunger in 
until the white strip is no longer    
visible. 

10.  Switch the toggle switch to the on 

position 

 
10.  Before re-installing power module lid 

(removed in Step 1), Verify SOC 
charge LEDs per table 3. 

 
11.  After SOC has been verified, secure 

power module lid using six #10-32 
fasteners.  

 

The installation process is now complete. 

USE EXTREME CAUTION WHEN INSTALLING       

BATTERY HARNESS.  ALWAYS WEAR INSULATING 

GLOVES WHEN CONNECTING BATTERIES. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Kaleidoscope® smart shelter installation and maintenance manual

 

Installation  

 

Circuit breaker shown in the off 

position (white stripe visible). 

Circuit breaker shown in the on 

position (white stripe is hidden). 

Switch shown in the off position 

(Toggle pointed up). 

Switch shown in the on position 

(Toggle pointed down). 

Reviews: