ASSEMBLE WITH CARE!
Pangard II
Polyester Powdercoat is a strong, long-lasting finish. To
protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or
other non-marring surface. Do not place or slide powdercoated parts on concrete or other hard or
textured surface – this will damage the finish causing rust to occur. Use touch-up paint on any
gouges in the finish caused by assembly tools.
1. Remove top retaining screws, top casting, optional plastic sleeve, and cover
ring from bollard to be mounted. See Fig. 1 and Fig. 5.
PROCEDURE FOR EMBEDDED INSTALLATION, WITHOUT LIGHT:
2. Embed bollard tube in a concrete footing that meets local frost conditions.
Be sure to allow for proper drainage. See Fig. 2 and Fig. 3.
3. Clean concrete from bollard tube before it sets. Allow concrete to cure.
PROCEDURE FOR INSTALLATION WITH LED LIGHT:
1. Complete steps 1-6 for surface mount installation or steps 1-3 for
embedded.
2. WITH POWER OFF
, connect fixture wires to supply wires using approved
local electrical code standard connectors.
PROCEDURE FOR SURFACE MOUNT INSTALLATION, WITHOUT LIGHT:
2. Place bollard in the desired position and mark hole locations. See Fig. 6.
3. Move bollard to allow access for drilling holes..
4. Drill holes at marked locations according to anchor manufacturer’s
specification.
5. Clear holes of debris.
6. Complete the anchor installation according to the anchor manufacturer’s
instructions.
FINAL INSTALLATION STEP:
1. Assemble remaining components. Align holes in top casting with threaded
holes for retaining screws. Retaining screws should pass through holes in
top casting.
PROCEDURE FOR SOLAR LIGHT INSTALLATION:
1. See page 3.
•
3/16” hex key (for non-solar bollard without sleeve)
•
1/4” hex key (for non-solar bollard with sleeve)
•
Surface mount bollard: The surface mount bollard has a 3/8” thick mounting plate
that can accept 4 anchors up to 1/2” dia. thread size. If stud anchors are used, select an
anchor length that allows the stud to extend 1” above the mounting surface. Non-
corrosive anchoring hardware recommended.
•
rebar for footing, if required
•
drain tubing to engineered fill, if required
Tools Required
Installation Guide
Annapolis
Bollard
www.landscapeforms.com Ph: 800.521.2546
Date: March 3, 2022
Page 1 of 4
6in
surface
mount
6in
embedded
6in
removable
12in
embedded
CAUTION!
Fixtures and wiring must be installed in accordance with local codes and
ordinances. Do not install lighted bollards within 10 feet of a pool, spa, or fountain.
NOTES:
•
Locate bollard where solar light receives a minimum of 4 hours of direct sunlight per
day. Avoid locations that would become shaded as the path of the sun changes with
the seasons. Solar powered light is not suitable for installation at latitudes greater
than 50 degrees.
•
Landscape Forms is not responsible for site preparation, footings, or electrical wiring.
•
The solar light should not be activated until the bollard is ready to be installed in a
location where it will receive required exposure to sunlight.
•
Failure to allow for proper drainage may void the standard Landscape Forms
warranty.
WARNING!:
LED cartridge and driver are not rated for connection or
disconnection while energized. Doing so may damage LEDs and will void the
warranty. Disconnect incoming power before making or breaking any electrical
connections.