ASSEMBLY INSTRUCTIONS
3-31
Figure 3-23: 1,200 Foot-Pounds of Torque
Final Assembly
1.
Attach a tractor to the implement and charge the lift
system hydraulics as described in
2.
Install the 2 x 16 transport lockouts on both 4-1/2 x
16 master cylinders on the center frame.
3.
The fold systems must be purged of air and filled with
oil
BEFORE
attempting to fold the implement. Air in
the system will allow the wings to fall uncontrollably
and may result in implement damage. Follow
instructions for charging the hydraulic fold system as
described in
“Hydraulic Fold System” on page 4-4.
4.
Connect lights to the tractor and verify operation.
5.
Check tires for proper inflation
6.
Level the Wing Coulter Chisel from front to rear as
described in
7.
Inspect the final implement assembly, and verify that
all bolts have been tightened, cotter pins spread, and
that there are no leaking hydraulic connections.
CAUTION
8.
Rotate each coulter gang to verify that each gang
rotates freely. Adjust any scrapers that may have
shifted during shipment or assembly.
9.
Lubricate the Wing Coulter Chisel at all locations as
described in
10. Touch up with paint any areas that may have been
scratched during moving, handling, or assembly.
11. Thoroughly read and understand the operating
section before using the Coulter Chisel.
Tighten all 1-3/4” nuts to 1,250 foot-pounds of
torque (See Figure 3-23.)
300
POUNDS
PULL
4 FOOT
torque ft lbs