Installation
28
Figure 2-5. Plastic Bridge Installation - Upper Screws
6. Attach bridge with two button head cap screws (Figure 2-6)
using 5mm hex wrench.
Tip:
Start both screws before tightening.
Figure 2-6. Plastic Bridge Installation - Lower Screws
7. Locate the Ribbon Cable and Pulse Cable (residential
models only) coming from the Lower Control Panel. Feed
them through the hole in the front of the upright and up
through the hole in the center of the upright (Figure 2-7).
M6X16 (4x) Button
Head Cap Screws
Cables from Lower
Control Panel
Notch
Plastic Bridge
M6X16 (2x)
Button Head Cap Screws