INSTALLATION

INSPECTION AND INSTALLATION

Upon receipt of the oven(s) any damage should be noted on the Bill of Lading and countersigned by the 

carrier.  If concealed damage is discovered the carrier should be notified.  All claims must be filed with 

the carrier.
Move the crate(s) containing the oven(s) as close to the place of installation as possible before removing 

the protective crating.  Uncrate the oven(s) and move them as close as practical to the final installation 

site.

Bolt the legs to the bottom oven, (See figure #2).  Use the 3/8 – 16 x 5/8 Bolts, Hex Nuts and Washers 

provided.  There are pre-punched holes provided in the legs and oven bottom to aid in leg installation.  

Now the oven can be set upright in or near its final position. 

SINGLE OVENS: 

Connect power throught the knockout on the bottom of the unit.

The oven can be placed in its final position and leveled.  The oven is ready for initial start-up procedures 

now.  (See page 7)

STACKED OVENS:   

Be careful to route the power supply wire 

between the two ovens using the holes 

provided.  Do not pinch or cut the supply wires 

when stacking the ovens.  Use the stacking kit 

provided to secure the top oven to the bottom 

oven.  
The stacking kit contains four (4) identical  

corner braces, one brace goes on each corner.  

Drill pilot holes for the mounting screws using 

the pre-punched holes as a guide.  Secure 

the top oven to the bottom oven with the sheet 

metal screws provided.  (See figure #3)

Connect the power supply leads from the top 

oven to the power supply leads of the bottom 

oven and incoming power per the wiring 

 

diagram on Page 11 or 12.
Now the bottom oven can be connected 

to the incoming power supply through the 

knockout provided in the bottom of the oven.   

Be sure the power supply voltage matches the  

voltage  specified  on  the  nameplate  located 

on the front of the oven!  Then the oven can 

be  placed  in  its  final  position  and  leveled.  

 

The oven is ready for initial start-up procedures 

now.  See page 7.

IL1321

Nut 3/8 - 16 Hex

Lock Washer

Washer

Oven Bottom

Bolt 3/8 - 16 x 5/8

Flange

Leg

Top Oven

Bottom Oven

Corner Brace

IL1322

Figure 2, Bolting Legs to bottom oven

Figure 3, Securing the top & bottom ovens together.

Summary of Contents for ECOD-AT

Page 1: ...1 SHIPBOARD ELECTRIC CONVECTION OVEN ECOD AT ECODL AT ECOF AT ECOFL AT Installation and Operation Instructions 2M W483 Rev E 3 18 13 ECOF AT...

Page 2: ...IZED SERVICE PERSONNEL ONLY NOTICE Using any part other than genuine Lang factory supplied parts relieves the manufacturer of all liability Lang reserves the right to change specifications and product...

Page 3: ...Model Height x Width x Depth Clearance from conbustible surface Weight Freight Class Actual Shipping ECOD AT ECO 6M 25 0 x 38 0 x 45 2 635mm x 966mm x 1148mm Side 6 153mm Back 6 153mm Floor 6 153mm 3...

Page 4: ...Model 1 ea Oven Type I Size 2 4 ea Legs 16 ea 3 8 16 x 5 8 Bolts For mounting legs 16 ea 3 8 16 Hex Nuts For mounting legs 32 ea Washers For mounting legs 2 ea Rack Slides Extra Deep 5 ea Racks Extra...

Page 5: ...NTER OR OTHER DEVICE ON WHICH OVEN WILL BE LOCATED MUST BE DESIGNED TO SUPPORT THE WEIGHT OF THE OVEN S SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN CUT THIS APPLIANCE MUST BE GROUNDED AT...

Page 6: ...supply wire between the two ovens using the holes provided Do not pinch or cut the supply wires when stacking the ovens Use the stacking kit provided to secure the top oven to the bottom oven The stac...

Page 7: ...GER OF SLIPS OR FALLS Each oven has the following controls Vent Pull to Open Push to close Timer Adjust to desired setting Temperature Turn to desired cooking temperature Power Switch Pull up to turn...

Page 8: ...l the factory at 314 678 6315 or www langworld com For the service station nearest you BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE THIS APPLIANCE WHEN THE UNIT IS PLUGGED WIRED INTO A LIVE RECEPTACL...

Page 9: ...y To replace the element remove the baffle at the back of the oven This will expose the elements to plain view and allow easy access Remove the element mounting screws located near the top of the oven...

Page 10: ...EEL REPLACEMENT for proper re installation of the blower wheel TRANSFORMER REPLACMENT Pull out control panel as previously outlined Mark the wires attached to the transformer Remove the wires Remove t...

Page 11: ...1 4 7 55 3 48 111 96 23 26 59 55 36 28 72 56 36 28 59 55 11 5 11 5 23 0 23 208 240 208 240 AMPS KW 1 PHASE L3 L2 L1 TOTAL VOLTS 2 DECK 2 DECK 1 DECK 1 DECK C REGULATING THERMOSTAT CONTACTOR MOTOR DOO...

Page 12: ...6 2 5 8 2 DECK 1 4 7 N A N A N A N A 1 2 5 14 5 33 30 20 15 41 31 5 20 15 33 30 11 66 11 66 23 33 23 33 2 75 3 67 5 5 7 33 2 75 3 67 8 91 8 6 16 4 33 8 91 8 380 380 440 AMPS KW 1 PHASE L3 L2 L1 TOTAL...

Page 13: ...13 This page intensionally left blank so the following pages face each other...

Page 14: ...14 SK2257 Rev 6 12 07 Model ECOF AT1M Electric Marine Convection Oven ECO 7M Electric Marine Convection Oven 1 2 3 4 5 6 7 8 9 10 11 8 SEE DETAIL A SEE DETAIL B Figure 6a...

Page 15: ...K SUB HATCHABLE 3 2P 70901 01 1 PLG BTN BLKPLSTC 1DP 1000 ECOD AT 440G ECODL AT440M ECOFL AT208M ECOFL AT440M 2P 70901 01 2 PLG BTN BLKPLSTC 1DP 1000 ECOF AT 480M ECOD AT 480M 4 Q9 ECO 437 1 DAMPER PI...

Page 16: ...16 Front 12 13 14 15 16 17 SK2258 Rev 6 12 07 Model ECOF AT1M Electric Marine Convection Oven ECO 7M Electric Marine Convection Oven SEE DETAIL C Figure 6b...

Page 17: ...nces may not be available Description Part Number Key Number 12 Q9 ECO 423 VENTS ASSY ALL 13 Q9 ECO 435 VENT CAP MILITARY ALL 14 Q9 ECO 449 1 DAMPER ROD B ASSY ALL 15 Q9 ECO 391 1 MOTOR MOUNT ASSY 440...

Page 18: ...18 DETAIL A SK2260a Typical Door Assy SEE DETAIL D 45 44 46 47 43 39 38 36 33 34 35 37 48 49 41 39 49 51 50 42 41 40 52 55 53 54 56 10 62 57 51 58 59 60 61 53 55 32 63 63 1 Figure 6c...

Page 19: ...10 4 SCRW THD MS 1 4 20X2 1 4 ALL 47 2C 20201 07 4 WSHR FLT 1 4 SAE PLTD ALL 48 Q9 ECO 563 4 RETAINER ALL 49 2C 20306 03 10 AVK CAD 10 32 1ST GRP ALL 50 Q9 ECO 572 1 RH DOOR VANE ASSY S S ALL 50 Q9 EC...

Page 20: ...20 18 19 20 21 21 22 23 24 25 26 27 28 29 20 31 30 DETAIL C SK2259a Motor Mount Assy Figure 6d...

Page 21: ...1PH 2SPD 208V 2U 30200 60 1 MTR 1 3HP380V1PH50HZ2SP 380V 19 2C 20118 01 4 SCRW CARRAGE PLT 5 16X 75 ALL 20 2C 20202 09 4 WSHR LOCK 3 8 STD SPLIT ALL 21 2C 20301 09 12 NUT HEX 10 24 PLTD ALL 22 Q9 GCCO...

Page 22: ...72 73 72 75 DETAIL B 76 77 78 79 80 84 81 82 83 64 65 66 67 68 70 71 DETAIL D 85 90 91 92 93 95 94 96 97 99 101 102 103 88 89 86 87 104 SK2261a Typical Door Stop Assy 105 106 107 108 109 110 111 Figu...

Page 23: ...STOP PAD ALL 86 Q9 50301 54 1 DOOR STOP ARM L H ALL 87 2C 20111 02 2 SCRW HXHD CAP 1 4 20X3 4 ALL 88 Q9 50301 52 1 DOOR STOP LH ARM BRACKET ALL 89 2C 20303 01 2 NUT HX SS 1 4 20 ALL 105 Q9 50301 90 1...

Page 24: ...24 STAR INTERNATIONAL HOLDINGS INC COMPANY Star Holman Lang Wells Bloomfield Toastmaster 10 Sunnen Drive St Louis MO 63143 U S A 314 678 6303 www star mfg com...

Reviews: