8
Section 1: Assembly & Set-up
Model SA35 Hydraulic Post Hole Digger 317-093M
12/17/14
Hydraulic Hose Assembly
Refer to Figure 1-3:
!
WARNING
Hose Assembly
Figure 1-3
1.
Install 45 degree elbows (#1) into motor ports as
shown and tighten.
2.
Screw 99" long hydraulic hoses (#2A & #2B) into
fittings (#1) and tighten.
3.
Attach straight adapter or 90
o
elbow fittings (#3) to
the other end of hydraulic hoses (#2A & #2B).
Tighten fittings to the hoses.
4.
Consult your Skid Steer or Tractor Operator’s Manual
to determine which line on the Skid Steer is under
pressure when locked for continues operation.
5.
Select the coupling (#4 or #5) that will mate with the
Skid Steer’s coupling that is under pressure and
attach that coupling to line (#2B) and tighten. Attach
remaining coupling to line (#2A) and tighten.
25539
Kubota CTL Note:
Attach female QD coupler (#4) to
hydraulic hose (#2B) and attach
the hose to the motor’s right port.
Right Port
Left Port
NOTE: Provided are four fittings (#3). Two are 90
o
elbows and two are straight adapters. Customer
may attach the fittings that best suits his fit-up.
NOTE: The preferred hose connections to the
equipment is to be able to lock hydraulic operation
in continues flow while digging hole. Line (#2B) is
the pressure line when digging (auger turning
clockwise). Therefore it is best to attach line (#2B) to
the Skid Steer or Tractor line that is under pressure
when controls are locked for continues operation.
Kubota CTL Note: Attach female QD coupler (#4) to
hydraulic hose (#2B) & hose to the motor’s right port.
Spring Hose Loop Assembly
Refer to Figure 1-4:
1.
Attach spring hose loop (#5) to hitch plate (#1) with
3/8"-16 x 1" GR5 cap screw (#2), flat washer (#4),
and hex locknut (#3).
2.
Torque nut to the correct torque.
Spring Hose Loop Assembly
Figure 1-4
Hose Hook-up
Refer to Figure 1-6 on page 9:
!
DANGER
!
DANGER
NOTE: Spring Hose Loop may not be used on some
Skid Steer hook-ups. For additional information, see
step under “Hose Hook-up” below.
30932