Section 4: Options and Accessories
PD10, PD15, PD25 & PD35 Post Hole Diggers 317-048M
8/9/19
28
Down Pressure Kit
Figure 4-9
Down Pressure Kits
Refer to Figure 4-9:
DANGER
!
To avoid serious injury or death:
WARNING
!
To avoid serious injury or death:
•
Hydraulic fluid under high pressure can penetrate the skin
•
Always follow “Tractor Shutdown Procedure” provided in
this manual before dismounting the tractor.
The Down Pressure Kit allows for additional digging force
in hard soil by use of a hydraulic cylinder to press down
on the boom. Down pressure created is between 300 and
500 lbs. depending on mounting configuration.
110133
Return Line to Sump
Furnished by Customer
Pressure Relief Line
Part No.
Description of Kit Bundle
317-159A
PD10 Down Pressure Kit
317-027A
PD15 Down Pressure Kit
317-028A
PD25/35 Down Pressure Kit
IMPORTANT:
Not providing some form of down
IMPORTANT:
The “Down Pressure” relief valve is
factory set to 1500 psi and must not be changed.
Exceeding this pressure can damage equipment.
The Down Pressure Kit is ready for operating after it has
been properly installed on the Post Hole Digger (see
following pages for Assembly Instructions). This kit
should be used only on hard soils where the auger will
not penetrate the ground on its own.
Normal digging operations are made with remote control
lever for the down pressure cylinder in neutral position.
When encountering hard soil, move control lever in the
proper direction to apply pressure. When lever is held in
this position, hydraulic pressure will not exceed 1500
p.s.i. Return control lever to neutral to continue normal
digging operations.
Boom/Yoke Pivot Pin Removal & Replacement
Figure 4-10
PD10 & 15 Down Pressure Assembly
The following instructions are for the PD10 & PD15 Post
Hole Diggers. For PD25 & PD35 Post Hole Diggers, see
“PD25 & 35 Down Pressure Assembly”
1.
Lower Post Hole Digger until auger point is resting on
the ground.
Refer to Figure 4-10:
2.
At the boom, and yoke connection, remove cotter
pin (#2) from existing clevis pin (#1).
3.
Use new pin (#3) in one end as a guide pin to remove
clevis pin (#1).
4.
Insert new clevis pin (#3) into this same location.
26821
NOTE:
PD15 boom bracket is supplied with three
mounting holes (shown) and PD10 Boom bracket is
supplied with only one mounting hole (not shown).