22
Section 2: Operating Instructions
NTS2607, NTS2609, & NTS2611 No-Till Seeder 329-141M
9/10/20
Hook-up 3-Point Seeder
Refer to Figure 2-1:f
WARNING
!
To avoid serious injury or death:
Lightweight tractors with rear attached implements may need
weights added to the front to maintain steering control.
Consult your tractor Operator’s Manual to determine proper
weight requirements and maximum weight limitations.
A 3-point Category II hitch is required unless the seeder
is Model NTS2607 without the Native Seedbox. Refer to
on page 13 for detailed hitch
requirements. The tractor’s lower 3-point arms must be
stabilized to prevent side-to-side movement. Most
tractors have sway blocks or adjustable chains for this
purpose.
1. Slowly back tractor up to the seeder while using the
3-point hydraulic control lever to lower and position
holes in the lift arms between Cat. I or Cat. II clevis
plates and in-line with clevis plate hitch holes.
2. Shut tractor down properly before dismounting. Refer
to
3. Attach lower lift arms to clevises with hitch pin (#1)
and secure with linchpins (#2). Make sure retainer is
rotated down to secure linchpins.
4. Adjust length of top center 3-point link to align center
link hitch hole with upper hitch hole on the seeder.
NOTE:
Land Pride’s Quick Hitch can be attached to
the tractor to provide quick and easy 3-point hook-
up and detachment. Be sure to read
on page 13 before hooking-up with
a quick hitch. See your nearest Land Pride dealer to
purchase a Quick Hitch.
5. Attach top center link to the seeder using
customer
supplied 3/4" diameter hitch pin (#3) and hitch
pin keeper (#5).
6. Start tractor and slowly operate controls to raise and
lower seeder to make sure the seeder clears the
tractor tires, frame, and drawbar.
7.
If drawbar interferes with seeder, shut tractor down
properly and the move drawbar out of the way or
remove it from the tractor. Refer to Tractor Operator’s
Manual for instructions on moving or removing
drawbar.
8. If not parked on level ground, restart tractor and
move to level ground.
9. Lower seeder until unit is resting on the ground.
10. Shut tractor down properly before dismounting.
11. Place a level across the main frame running from left
to right.
12. Manually adjust one of the lower lift arms up or down
until seeder is level from left to right.
13. Rotate level 90 degrees and adjust length of upper
center 3-point link to level seeder from front to back.
Final adjustment of the center link will be made later
“Level Seeder With 3-Point Mount”
14. Hook-up lead wire harness (#4) to the tractor’s 7-way
round pin receiver. See Figure 1-1 on page 13.
15. Remove slow moving vehicle sign from the back of
the tractor and insert it in the mounting socket on the
back of the rear seedbox. Refer to
on page 26 for detailed instructions.
NOTE:
Center hitch pin (#3) and hitch pin
keeper (#5) are customer supplied.
Tractor Hook-up to 3-Point Seeder
Figure 2-1
73359
37298
CAT I HITCH
CAT II HITCH