background image

2

Figure 1B

1.7

Remove one (1) screw holding the bracket on the Lancer Electronic Ice Bank Control housing
(EIBC) and loosen the other.  Spin the bracket 90° as shown in Figure 2, reinstall screw and 
tighten both screws.

1.8

Mount EIBC Control Housing Assembly at holes previously used for the Ranco Control, 

using the

screws removed in Step 1.6.

1.9

Remove Cover of EIBC Control Housing Assembly.  Connect lead from Compressor to screw 
terminal marked "HOT OUT".  Connect lead from Junction Box and Agitator Motor to terminal
marked "HOT IN" (see Figure 1B and Figure 2).

Figure 2

Reviews: