
PAGE 7
BRINE LINE FITTING CONNECTIONS
DRAIN LINE FITTING CONNECTION USING 5/8" POLY TUBE
Click to buy NOW!
PD
F-XCHANGE
w
ww
.docu-track.c
om
Click to buy NOW!
PD
F-XCHANGE
w
ww
.docu-track.c
om
POLYTUBE
6. Assemble the brine tank. Install a brine well cap (Item A)
on the bottom of the brine well (Item B). Remove the brine
valve assembly (Item C) from the brine well by removing the
nut (Item D). Attach the brine well to the brine tank with the
two-piece overflow (Items E & F) using the lower holes in
both pieces, as shown. Reinstall the brine valve assembly.
Push brine line polytube (Item G) through the upper holes in
the brine tank and brine well and press the polytube into the
elbow fitting.
(All electrical & plumbing should be done in accordance to all local codes)
INSTALLATION INSTRUCTIONS CONT’D
7. The brine refill flow control assembly is installed in an easy to access refill elbow located on top of the control valve. The
refill flow control assembly is attached to the control valve with a locking clip. The locking clip allows the elbow to rotate 270
degrees so the outlet can be oriented towards the brine tank.
8. Connect the brine line polytubing found with the brine tank to the brine connection on the control valve. The control valve
has a standard refill elbow to which a 3/8” flexible tube can be connected, see
below. Press the polytube into the brine elbow
fitting. Make sure the floor is clean beneath the brine tank and that it is level and smooth.
9. A 1/2” (inside diameter, not provided) gravity drain line should be connected to the overflow fitting on the side of the brine
tank. This overflow is in case of a malfunction in the brine shut off. If the unit is installed where water may flow in the event of
an overflow and cause water damage, connect a length of flexible tubing and run to a drain below the level of the overflow.
(Do not connect the tubing to the drain line on the control valve. Do not run tubing above overflow height at any
point.)
A
G
A
F
B
D
C
E