Lancaster 7-LWT-UV009 Installation, Operating And Service Manual Download Page 9

PAGE 9

Operating & Maintenance Instructions:

Caution: Prior to performing any work on the disinfection system, always disconnect the power 

supply first.

UV LAMP REPLACEMENT:

1.  To replace the lamp, there is NO need to disconnect the system from the water supply, nor to drain the water from 

the UV chamber. DO NOT USE WATER DURING THIS PROCEDURE

. Lamp replacement is a quick and simple 

procedure requiring no special tools. The UV lamp must be replaced after 9,000 hours of continuous operation 

(approximately one year) in order to ensure adequate disinfection.

2.  Unplug the electronic ballast from the electrical outlet and allow the lamp to cool for at least 5 minutes before 

removing. Pull out the U clip from the gland nut. Remove busing, connector and lamp from the UV chamber. Separate 

the lamp from the connector. Do not twist the lamp from the connector, simply slide the two apart. Avoid touching 

the lamp’s quartz surface. Handing the lamp at the ceramic ends is acceptable, however if you must touch the lamp 

quartz, please use gloves or a soft cloth. Fully remove the lamp from the reactor chamber being careful not to angle 

the lamp as it is removed from the chamber. If the lamp is removed on an angle, pressure will be applied on the inside 

of the quartz sleeve, causing the sleeve to fracture.

3. 

To install a new lamp, first remove the lamp from its protective packaging, again being careful not to touch the lamp’s 

quartz surface. Oil deposits from your fingers can create hot spots on the surface which may lead to premature 

lamp failure. Handle the lamp by the ceramic ends only. If the quartz surface becomes dirty, use a lint-free cloth and 

isopropyl alcohol to remove dirt. Carefully insert the lamp into the UV vessel (actually inside the quartz sleeve). Insert 

the lamp fully into the chamber leaving about two inches of the lamp protruding from the chamber. Next, attach the 

connector to the UV lamp. Ensure the connector is fully seated onto the UV lamp.

4.  Once the lamp is fully seated on the connector, slide the connector and bushing into the aluminum gland nut. Gently 

press down on the bushing and squeeze/slide the U clip through the gland nut’s four upper holes (2 pair, 180° apart).

5.  Plug in ballast to the electrical outlet.

      NOTE: RESET LAMP LIFE TIMER AFTER LAMP REPLACEMENT (PG 9)

 - refer to www.lamprecycle.org for lamp 

      disposal

QUARTZ SLEEVE REPLACEMENT / CLEANING:

Mineral deposits and sediment may accumulate on the quartz sleeve decreasing the UV light transmittance and system 

performance. Good maintenance of filtration equipment will reduce the accumulation of residues. If necessary, remove the 

quartz sleeve and clean with a commercially available scale remover (CLR, Lime-Away, etc.) and a lint free cloth. Repeat 

the process as often as necessary to keep the quartz sleeve clean. Be sure to remove all traces of cleaning fluid from the 

sleeve before it is reinstalled in the UV chamber (be sure not to allow liquid inside the sleeve).
1.  First remove the UV lamp by following steps 1 & 2 as outlined in the “Lamp Replacement” section above.
2.  Shut off the upstream water supply that feeds water into the UV chamber. 
3.  Shut off the downstream water supply. If your system does not have a separate downstream valve, simply open a 

downstream faucet to release any pressure that may be built-up in the system.

4. 

Remove the aluminum gland nut by turning counter clockwise. Place a small pail under the UV chamber to catch any 

water that may leak from the system. Grasp the quartz sleeve and fully remove from the UV chamber. Make sure the 

sealing o-ring is removed with the quartz sleeve. As with the lamp, make sure the sleeve is removed from the UV 

chamber being careful not to angle the sleeve as it is removed from the chamber to avoid breakage.

5.  Clean the sleeve as described above, or replace with a new sleeve. Reinstall the quartz sleeve in the reverse order. 

To install the sleeve, carefully insert the sleeve into the UV chamber (do not drop) until the sleeve domed end seats 

in the center of the hourglass retainer spring located in the end of the chamber. Install o-ring onto the sleeve until it is 

positioned against the chamfered seat. Make sure the small lamp compression spring is inside the sleeve.

6. 

Reinstall the aluminum gland nut on the UV chamber and tighten by turning clockwise. The gland nut should be 

hand- 

tightened only

, the use of a wrench is not required, nor recommended. Reinstall the UV lamp and connector as 

outlined in steps three and four of the “Lamp Replacement” section.

7. 

Slowly turn on water and pressurize the chamber to verify that there are no leaks.

8.  Reconnect to power source and ensure that the UV lamp is operating by verifying ballast green LED indicator is on 

and display is operational.

Summary of Contents for 7-LWT-UV009

Page 1: ...RTIFIED PLUMBER IS RECOMMENDED In the event that you need assistance for servicing your UV system please first contact the professional contractor who installed the system Congratulations on purchasing your new Lancaster Water UV Disinfection System This unit is designed to give you many years of trouble free service For servicing and future inspection purposes please file this booklet with your i...

Page 2: ...rforming any cleaning or maintenance activities Never yank the cord to remove from an outlet grasp the wall plug and pull to disconnect 8 Do not use this disinfection system for other than intended use potable water application The use of attachments not recommended or sold by the manufacturer distributor may cause an unsafe condition 9 Intended for indoor use only Do not install this disinfection...

Page 3: ...t a lower performance than intended Qty 2 21S UV Electronic Ballast Mounting Screw Qty 2 21A UV Electronic Ballast Mounting Anchor Ground Screw attached Model SS UV Chamber Domed Quartz Sleeve length 7 LWT UV009 7 LWT UV016 7 LWT UV030 100 UV 200 UV 300 UV 7 Q6 13 1 8 7 Q10 21 3 8 7 Q20 34 3 4 UV Lamp A Four pins 7 L6 11 13 16 7 L10 20 1 16 7 L20 33 3 16 18 UV Lamp Compression Spring 14 UV Aluminu...

Page 4: ...ONIC BALLAST CONTROLLER MODEL 7 LWT UV009 7 LWT UV016 7 LWT UV030 INLET OUTLET A B C D E F DIA 1 0 MNPT 1 0 MNPT 1 5 MNPT 3 1 2 3 1 2 3 1 2 5 17 3 8 13 3 8 1 3 8 13 9 16 5 25 5 8 21 11 16 21 13 16 1 3 8 5 1 4 2 1 8 39 3 4 35 1 16 35 9 16 C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m ...

Page 5: ...ctor POWER CONSUMPTION 34 W 29 W 45 W 50 W 90 W 80 W LAMP WATTS LAMP TYPE LOW PRESSURE HIGH OUTPUT LPHO ELECTRICAL MAXIMUM OPERATING PRESSURE 125 PSI AMBIENT AIR WATER TEMPERATURE 36 to 104 F PRESSURE DROP at 30mJ cm RATED FLOW 2 LESS THAN 1 PSI CHAMBER MATERIAL 304 SS INLET OUTLET PORT SIZE 1 0 MNPT 1 0 MNPT 1 5 MNPT STEADY WORK GREEN LED LAMP ON INDICATOR LAMP LIFE REMAINING DAYS CONTINUES TO BE...

Page 6: ...llation is vertical with the lamp connector on top This is to prevent water damage from occurring on the lamp connector and lamp pins Leave space at least equal to the overall length of the disinfection system to allow clearance for the removal and replacement of the lamp and or quartz sleeve The electronic ballast should be mounted either above or beside the stainless steel UV reactor chamber Nev...

Page 7: ...y Ensure that the flow of the water matches the flow direction as indicated on the flow restrictor DO NOT SOLDER CONNECTIONS WHILE ATTACHED TO THE SYSTEM AS THIS COULD DAMAGE THE O RING SEALS 5 Mount the electronic ballast controller horizontally to the wall near the UV reactor chamber Ideally place the controller above the reactor and away from any water connection point to prevent any water from...

Page 8: ...rom the system until no chlorine smell is detectable Make sure that each fixture that was disinfected in step two is completely flushed of the chlorine solution as the consumption of the water is not advised due to the extremely high concentrations of chlorine It is important to remember that in the event that a UV is briefly shut down for a routine cleaning or during power interruptions where wat...

Page 9: ...TER LAMP REPLACEMENT PG 9 refer to www lamprecycle org for lamp disposal QUARTZ SLEEVE REPLACEMENT CLEANING Mineral deposits and sediment may accumulate on the quartz sleeve decreasing the UV light transmittance and system performance Good maintenance of filtration equipment will reduce the accumulation of residues If necessary remove the quartz sleeve and clean with a commercially available scale...

Page 10: ...und again if the lamp has not been replaced The alarm can be silenced up to 4 times 28 days After 4 times the alarm can no longer be silenced until a replacement lamp is installed and the lamp life timer is reset RESET LAMP LIFE TIMER AFTER LAMP REPLACEMENT After replacing the lamp by following instructions on the previous page reset the lamp life timer to 365 days by pressing and holding the butt...

Page 11: ...OUND SCREW UNDER BALLAST U CLIP BUSHING LAMP CONNECTOR ALUMINUM GLAND NUT LAMP COMPRESSION SPRING O RING QUARTZ SLEEVE GROUND NUT UV LAMP GROUND WIRE RING TERMINAL STAINLESS STEEL UV CHAMBER QUARTZ SLEEVE DOMED END Refer to PRODUCT OVERVIEW page for replacement part numbers GROUND WIRE FORK TERMINAL ...

Page 12: ...emperature Excessive Heat Generated Water temperature is too high Ensure treatment is on cold water side only prior to heating of water Water Appears Milky Caused by air in the water lines run water until air is purged Unit Leaking Water Problem with o ring seal on gland nut ensure o ring is in place check for cuts or abrasions clean o ring moisten with water and re install replace if necessary Co...

Page 13: ...PAGE 13 A DIVISION OF C B TOOL CO 1340 MANHEIM PIKE LANCASTER PA 17601 3196 TEL 717 397 3521 FAX 717 392 0266 www lancasterwatergroup com E mail info lancasterwatergroup com 3 18 ...

Reviews: