LEGACY FG
033-0004
Page S.5
REV. 0/04-23-2007
Supplement–Legacy Fixed Gear
Lancair International Inc., Represented by Neico Aviation Inc., Copyright 2007 Redmond, OR 97756
S.3 Preparing for the Main Gear Installation
S.3.A Leveling the Fuselage
Steps...
1. Set the fuselage to level for pitch and roll.
Remember to rest the fuselage high enough to allow room for the gear legs. Allow approximately 32” from the
floor to the bottom of the wing stubs.
Secure the fuselage in its level position.
2. Mark a center line on the floor. For more information on locating a center line, see Chapter 7, page 7-3 of the
Legacy Assembly Manual
. This will refresh your memory on drawing a center line.
Figure S.3.A.1 Leveling the fuselage
S.4 Installing the Gear Legs
S.4.A Positioning the Gear Leg
The top of the gear leg needs to be 50° from horizontal.
Figure S.4.A.1 Cross-section view of the gear leg angle