
27
6
Commissioning
6
Commissioning
WARNING!
Prior to commissioning, carefully read the manual and heed the instructions.
The measuring system may be operated only by trained and instructed personnel!
Improper working/operation can cause death, serious bodily injury and/or considerable mate-
rial damage.
NOTICE
Before commissioning, the KS1D combination probe and all alarm/signal outputs are connect-
ed, as described in Chapter
in these operating instructions, to the LT3-F Lamb-
da Transmitter.
WARNING!
Before actuating the main switch for the voltage supply, ensure all housings (evalua-
tion electronics and terminal boxes, electrical connection of the probe) are sealed in
accordance with the instructions!