background image

 

 
Installation: 

 

1. 

Screw in the studded rod (G) into the base of the tap (D). 

 

2. 

Place the upper seal (F) into the base of plinth (E) then place the base plinth (E) onto the bottom of the tap (D). 

 

3. 

Screw the hot & cold water tail pipes (K & L) into the base of the tap (D). 

 

4. 

Place the mixertap (D) onto the sink or worktop, pass the tail pipes (K & L) and studded rod (G) through the taphole. 

Note: The fixing stud (G) MUST be positioned in front of tail pipes (K, L) when viewed from the front. 

 

5. 

Pass the lower gasket (H) and then metal horseshoe (I) over the studded rod (G) and around the tail pipes. 

 

6. 

Fasten the fixing nut (J) securely onto the fixing stud (G) to fix the tap into its correct location. 

 

7. 

Push out indices (A) from the rear face of handles (B). Screw on by hand handle insert (B) onto the tap handle stem (C) as shown, making sure 
indices (A) are not included. 
 

8. 

Push indices (A) onto handle insert (B) as shown.  

Note: Make sure indices are aligned correctly and ‘H’ and ‘C’ are placed onto the correct handles. Indices (A) is showing COLD handle. 

 

9. 

Repeat steps 7-8 for hot handle. 

 

10.  Connect the hot and cold tail pipes (K & L) to the water mains using a ½” BSP x 15mm compression fittings. Note the copper pipes can be carefully 

bent to allow more space for the connecting fittings. 

 

After installation: 

 
Once you have visually checked the installation of the new 
tap and all connections, ensure that all other fittings are 
closed except the new tap which should be left open.  
 
Turn on your water heating system and ensure that your 
mains stopcock is open. Reconnect both the hot and cold 
water supplies to this fitting. 
 
Check the function of flow and function of hot, cold and 
mixed water. 
 
Turn off the tap and check carefully for any leaks around all 
connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to 
double check for slower leaks. If pressure testing 
equipment is available check the installation to the 
maximum recommended pressure. 
 
Clean the tap to remove any marks created during 
installation as instructed then place a bag over the product 
to protect the tap until it is ready for use. 
 
The installation should be periodically checked for damage, 
if the property is left unattended for a prolonged period we 
recommend isolating water supplies. 

 

 

 

Key: 

Description: 

Qty. 

 

Indices 

 

Coloured handle insert 

 

Tap handle 

 

Tap body 

 

Base plinth 

 

Upper seal 

 

Fixing stud (95mm) 

 

Lower gasket 

 

Metal horseshoe 

 

Fixing nut 

 

Hot 15mm tail pipe 

 

Cold 15mm tail pipe 

 

*  Supplied separately  

                                                                                                                                                                                                                                   Ref/tap4803v3 

Reviews: