- 48 -
INSTALLATION
RECIRCULATING PUMP
The condensation of the water vapour contained in the flue gas leaving
the boiler (condensate) occurs when the return water temperature is less
than 55°C and is significant above all when starting in the morning, after
the boiler has been off all night. This condensate is acidic and corrosive
and, over time, attacks the metal plate on the boiler. Consequently, a recir-
culating pump with the function of preventing condensate should be
installed between the outlet and return fittings, upstream of any mixing
valve.The pump must ensure, when the system is operating, a flow-rate of
between 20 and 30% of the total; it must also ensure a return water tem-
perature no less than 55°C, while the required discharge head is quite low,
as it only needs to overcome the resistance of the boiler and the valves.
To measure the effective central heating return inlet temperature for the
purpose of controlling the condensate prevention pump or managing
the functions for getting the system to stable temperature operation, a
probe socket must be fitted at a distance equivalent to 3-5 times the dia-
meter of the return pipe upstream of the water coupling.
Summary of Contents for MEGA 92
Page 2: ......
Page 13: ...13 ITALIANO INSTALLAZIONE COLLEGAMENTO PANNELLO ELETTRICO MEGA 92 300 MEGA 350 1060...
Page 30: ......
Page 41: ...41 ENGLISH INSTALLATION ELECTRICAL PANEL CONNECTION MEGA 92 300 MEGA 350 1060...
Page 58: ......
Page 69: ...69 INSTALLATION FRAN AIS RACCORDEMENT PANNEAU ELECTRIQUE MEGA 92 300 MEGA 350 1060...
Page 86: ......
Page 97: ...97 INSTALACI N ESPA OL CONEXI N PANEL EL CTRICO MEGA 92 300 MEGA 350 1060...
Page 114: ......
Page 115: ......