Initial Operation
Daily Start-up
24
Laird Technologies GmbH
Operation Manual
Date: 20-Apr-2014
Version: 1.0
Water-Water Cooler WW 3001
1104.00
3)
If required, refill coolant.
4)
Check the compliance with the operational parameters as specified on page 17.
5)
Remount cap on coolant container.
6)
Switch off the unit.
The unit is ready for operation.
6.3 Daily Start-up
Switch on the unit about 1 minute prior to using the device to be cooled.
6.4 Setting to work after Storage
Setting-to-work after storage will have to follow the same procedures as required for initial operation (see
chapter 6.2).