7
On/Off Switch
Attach the On/Off switch (Fig.1) to holes A using
the fixed bolts
Control Box
The jointer is equipped with a control box provided
with a key-operated power switch and ON . OFF
push buttons. See Fig. 2. To lock the switch in the
OFF position, remove the switch key from the switch.
Place the key in a location that is in accessible to
children and others not qualified to use the tool.
WARNING: Ensure that your workplace is
inaccessible to children by closing and locking all
entrances when you are away. NEVER allow
untrained visitors in workplace when assembling ,
adjusting or operating equipment.
Cutterhead Guard Installing & Removal
1. Disconnect jointer from power source.
2. Turn knob (A) counterclockwise to create tension
on spring, and hold it there Fig 3.
3. Insert guard post (B) down through hole in front of
ledge.
4. Slightly turn set (A), if necessary, until the guard
seats itself, and the spring engages the slot at the
end of the guard post.
5. Check the guard for proper tension. If guard does
not spring back into place when pulled back from
cutterhead, remove guard and adjust spring
tension by repeating steps 1-3 until correct tension
is achieved. NEVER run the jointer without the
guard.
WARNING: Use the jointer guard for al l
operations.
Fig. 1
Fig. 2
.
Fig. 3
!