background image

961003 

REV012021 

DAKE STANDARD TERMS & CONDITIONS OF SALE 

All proposals and quotations for the original sale of our products are subject to the following terms and 

conditions: 

ACCEPTANCE OF ORDER

: All orders are subject to acceptance by Dake at its main office in Grand Haven, 

Michigan. 

APPLICABLE LAWS

: This quotation or acceptance shall be governed in all respects by the laws of the 

State of Michigan. 

CANCELLATION: 

We reserve the right to cancel and/or

 

refuse to complete your order if, in our opinion, 

you have not established credit to promptly meet the payment terms of your order. Any cancellation 

from the Purchaser may be subject to a 10% cancellation fee for any of our standard machinery and/or 

component parts upon the discretion of Dake. All non-standard or special quotes will not be eligible for 

cancellation, nor returns.  

DELIVERY

: The proposed shipment date is an estimate and is contingent upon causes beyond Dake’s 

control. Under no circumstances shall Dake have any liability

 

for loss of use or for any direct or 

consequential damages resulting from delay. All shipments from the Dake facilities are F.O.B.

 

FREIGHT CLAIM: 

Lost or damage freight claims must be submitted to Dake within thirty (30) days of 

shipment from Dake’s facility. If shipment for order was set up by the Purchaser, Dake is not liable to 

handle the freight claims. 

PERMITS AND COMPLIANCE

: Dake shall not be responsible for obtaining any permits, inspections, 

certifications, or licenses required for the installation or use of the equipment. Dake makes no promise 

or representation that the equipment or any services to be furnished by Dake will conform to any 

federal, state, or local laws, ordinances, regulations, codes or standards. 

PRICES

: Unless otherwise agreed to in writing, all prices are F.O.B. from our plants in Grand Haven, 

Michigan, Grand Prairie, Texas, and Riverside, CA. In any event, the quoted prices for component parts 

become invalid ten (10) days after date of quotation, and machinery may become invalid sixty (60) days 

after date of quotation. Unless otherwise specified in Dake’s quotation, installation services and final 

on-site adjustments are not included in the quotation. 

TAXES

: Prices do not include taxes. If any sales, use or similar tax is payable to Dake in connection with 

any transaction or part thereof between the Purchaser and Dake with respect to goods delivered, the 

Purchaser will, upon demand, pay to Dake the amount of any such tax. If you are tax exempt, please 

include your exemption document when submitting your order. 

Summary of Contents for DAKE FG-75

Page 1: ...DAKE FG 75 Belt Grinder Instructional Manual 1809 Industrial Park Dr Grand Haven MI 49417 Phone 1 800 987 3253 E mail customerservice dakecorp com...

Page 2: ...TED WARRANTY 3 RETURN REFUND POLICY 5 DAKE STANDARD TERMS CONDITIONS OF SALE 6 SPECIFICATIONS 11 UNCRATING ASSEMBLY 13 MAINTENANCE 26 REMOVING THE BELT 27 REPLACING THE BELT 34 TROUBLE SHOOTING 38 ELE...

Page 3: ...ty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the manufacturer will repair or replace any portion of th...

Page 4: ...maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid freight terms d Normal maintenance s...

Page 5: ...e returned item must have the provided RMA number clearly marked on the outside packaging Any item received without an RMA number clearly visible on the packaging will not be processed An RMA number c...

Page 6: ...ims must be submitted to Dake within thirty 30 days of shipment from Dake s facility If shipment for order was set up by the Purchaser Dake is not liable to handle the freight claims PERMITS AND COMPL...

Page 7: ...r any part of any equipment sold by Dake is defective in material or workmanship and is so found after inspection by Dake it will be replaced or repaired at the option of Dake providing the equipment...

Page 8: ...961003 8 REV012021 DANGER WARNING Note PROHIBITION Useofworkglovesisprohibited Correct NOT correct USE MAINTENANCE Readthepageidentifiedbythesymbol Measurements and distances to be observed...

Page 9: ...961003 9 REV012021 FG 75 0 2 1 577 SWITCHONthemachine FG 75 0 2 1 577 SWITCH OFF the machine Power OperationtobeperformedwithCARE...

Page 10: ...961003 10 REV012021 OperationtobeperformedwithFORCE Voltage Frequency Speed Noise Weight ADJUSTMENTS ASSEMBLY Operations using the SANDER ObjecttobeRECYCLED...

Page 11: ...Speed 6 600 FPM Grinding Plane 3 x 21 Electrical Components CE Approved Weight 139 lbs Work Height 22 48 Base Dimensions 17 x 21 Machine Width 22 Machine Length 39 Overall Height 43 Voltage Available...

Page 12: ...upport surface 5 Rubber coatedpulley 6 Motor 7 Adjustable safety shield 8 Quick locking lever 9 Belt adjustment knob 10 Lever to unblock graduation scale 11 Belt 12 Emergency stop 13 Base 14 Fixing ho...

Page 13: ...961003 13 REV012021 x 1 x 1 18 17 A UNCRATING ASSEMBLY...

Page 14: ...961003 14 REV012021 580 cm 480 cm FG 75 1000 cm 1 1 577 540 cm 2 610 cm 1000 cm 3...

Page 15: ...961003 15 REV012021 Use personal protective equipment SerialnumberandYearofmanufacture 1 2...

Page 16: ...961003 16 REV012021 800 mm A 800 mm A...

Page 17: ...961003 17 REV012021 FG 75 1 2 3 4 ASP020...

Page 18: ...961003 21 REV012021 1 1 2 2 1...

Page 19: ...961003 22 REV012021...

Page 20: ...rypersonalprotectiveequipment safety goggles safety shoes INFORMATION CONCERNINGNOISE The noise values indicated are emission levels and not necessarily safe operating levels While there is acorrelati...

Page 21: ...961003 24 REV012021 1 2 0 2 3a 3 FG 75 3b 2 1 1 4 577 0 2 1 5 FG 75 577 C C FG 75 1 1 1 0...

Page 22: ...961003 25 REV012021 2 2 2a C C 2b 2 FG 75 1 0 1 577 3 4 0 2 1 FG 75 577 1 0 1...

Page 23: ...160hr Check electrical equipment every 480 hr Checkthemotor selectricalinsulation every960hr CLEANING BEFORE PERFORMING ANY CLEANING WORK STOP THE MACHINE AND LET IT COOL DOWN Wear protective gloves O...

Page 24: ...961003 REV012021 REMOVING THE BELT...

Page 25: ...961003 REV012021 5 4 3 3 1 2...

Page 26: ...961003 REV012021 8 9 7 6...

Page 27: ...961003 REV012021 14 15 10 11 12 13...

Page 28: ...961003 REV012021 16 17 18 19 20...

Page 29: ...961003 REV012021 3 4 5 2 2 1 REPLACING THE BELT...

Page 30: ...961003 REV012021 7 9 10 11 2 6 8...

Page 31: ...961003 REV012021 2 14 13 11 12...

Page 32: ...961003 REV012021 17 18 16 2 15...

Page 33: ...nnel DANGER WARNING NEVER ATTEMPT TO REPAIR THE MOTOR YOURSELF IT COULD BE DANGEROUS Checkthefusesandreplacethemif necessary Themotorismakingtoo much noise 1 Faultymotor Damaged i di 1 Havethemachinem...

Page 34: ...961003 REV012021 EXPLODED PARTS VIEW...

Page 35: ...8265020 30 81 8265020 81 31 Drive Pulley 8265020 31 84 8265020 84 32 8265020 32 85 8265020 85 33 8265020 33 86 8265040 86 34 8265020 34 87 8265020 87 35 Body 8265040 35 88 8265020 88 36 8265020 36 89...

Reviews: