background image

 

 

Dake Corporation 

 

 

1809 Industrial Park Dr 

 

Grand Haven, MI 49417 

www.dakecorp.com

 

 

907003 

 

10 

REV112019 

 

TROUBLESHOOTING 

 

PUMP PACKING LEAKAGE 

 
If oil leaks past the pump packing, tighten the pump packing nut (item 9) until the pump handle 
moves with resistance, then slack off just enough to cause the handle to stay in position by 
itself. After long periods of operation, it may be necessary to install new pump packings. 

 

PRESS NOT HOLDING PRESSURE 

 

This condition is nearly always caused by dirt under the pressure ball valve (item 2). See hand 
pump assembly drawing.  
 
Steps to fix pressure: 

1.  Remove the reservoir drain plug and drain all oil out of the reservoir. 

2.  Remove parts: pipe plug (item 18), check valve spring (item 6) and ball valve (item 2) 

then clean out the port hole and valve seat thoroughly.  

3.  Using a small piece of brass rod as a drift, tap on the brass rod lightly to seat the ball 

valve in place.  

4.  Replace the spring and plug with extreme care to prevent dirt from entering. 

5.  Replace the drain plug and refill the reservoir with clean filtered oil.  

See “

FILLING PRESS WITH OIL”

 section in manual for instructions.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for DAKE 75H

Page 1: ...k Dr Fax 800 846 3253 Grand Haven MI 49417 DAKE HAND OPERATED HYDRAULIC PRESS Model 75H INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure...

Page 2: ...D WARRANTY 2 RETURN REFUND POLICY 4 SAFEGUARDING THE POINT OF OPERATION 4 SPECIFICATIONS 6 SAFETY 6 SET UP 8 FILLING PRESS WITH OIL 8 OPERATION 9 CONTROLS 9 MAINTENANCE 9 LUBRICATION 9 TROUBLESHOOTING...

Page 3: ...ir work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the manufact...

Page 4: ...or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid freight te...

Page 5: ...tive will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item received without an RMA number clearly...

Page 6: ...ard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of the hydraulic power press production syst...

Page 7: ...he specific machine SAFETY This is the safety alert symbol When you see this symbol on your press be alert to the potential for personal injury Employer is responsible to perform a hazard PPE assessme...

Page 8: ...orized employees as per OSHA Hydraulic Relieve all hydraulic pressure before servicing the press Turn the red release handle to relieve the pressure Spring Pressure Clamp ring on bottom of piston must...

Page 9: ...h on the cable drum a Place the table pins under the table before releasing the hoist crank when positioning the table channels for cable tracking servicing or set up for desired work operating Be sur...

Page 10: ...piston may occur if not pumped before meeting the work Release Valve Handwheel releases the pressure to let the ram return to its raised position Always keep the valve firmly closed when operating th...

Page 11: ...is nearly always caused by dirt under the pressure ball valve item 2 See hand pump assembly drawing Steps to fix pressure 1 Remove the reservoir drain plug and drain all oil out of the reservoir 2 Rem...

Page 12: ...iston Packing Item 34 is worn or damaged 5 Gauge Item 39 is defective 1 Replace Pump Plunger leather 2 Remove and clean Check Balls and Seats 3 Reseal Ball on Seat 4 Replace Piston Packing 5 Replace G...

Page 13: ...0 x 1 2 Nylock 28297 1 14 Handle Socket Pin 594 3 15 Valve Rod 1129 1 4 Washer 12 Flat 43629 1 16 Valve Rod Packing Nut 576 1 5 Pump Plunger Leather 599 1 17 Valve Rod Packing 987 8 6 Check Valve Spri...

Page 14: ...Handwheel 716520 1 36 Handwheel 716521 1 26A Clamp Ring Assembly 718 1 37 Yoke 732 1 26B Piston Bumper 738 1 38 Cylinder Gasket 1478 1 27 Oil Seal 1477 1 44 Air Vent Tube 1 4 x 3 632 1 28 Pipe Plug 1...

Page 15: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 907003 14 REV112019 GENERAL ASSEMBLY...

Page 16: ...e Name Plate 81002 1 61 Table Spacer 86488 4 45 Handwheel 10631 1 Hex Head Bolt 5 8 11 x 10 1 2 79983 4 46 V Block 336 2 47 Table Plate 702 2 Hex Nut 5 8 11 43917 4 48 Table Pins 569 6 Lock Washer 5 8...

Page 17: ...Part No Qty 56 Hex Nut 3 8 16 Not Shown 43912 2 69 Hex Cap Screw 3 8 16 x 2 3 4 43335 2 62 Hand Crank Assembly 701653 1 71 Drum Shaft 724 1 63 72 Drum Key 737 1 64 Worm Shaft 384 1 73 Worm Gear 736 1...

Page 18: ...112019 Please contact factory for current prices ORDERING INFORMATION Parts are available for direct purchase from Dake or through a distributor When placing a parts order you will need to provide the...

Reviews: