SAFEGUARDING THE POINT OF OPERATION 

ANSI B11.2 - Hydraulic Power Presses - 

Safety Requirements for Construction, Care, and Use 

 

 

It is important that Dake press users have a clear understanding of their responsibility involving the care and 

use of their Dake hydraulic press, including point-of-operation safe guards. Dake strongly recommends that 

Dake press users obtain a copy of the current American National Standard Institute (ANSI) B11.2 standard, for 

a more complete understanding of their responsibilities.  

 

ANSI B11.2 states the following, relative to point of operation safeguarding: 

 

“Normally, only the employer (press user) can determine the requirements of the press productions system 

components, including the dies and methods for feeding. Therefore, the employer is ultimately responsible to 

designate and provide the point-of-operation safeguarding system.” 

 

The standard also discusses additional responsibilities of the employer. Some of the key responsibilities are: 

  The employer is responsible for the safety, use, and care of the hydraulic power press production system.  

  The employer is responsible to consider the sources of hazards for all tasks to be implemented on the 

hydraulic power press production system.  

  The employer is required to eliminate or control identified hazards in the scope of their work activity.  

  The employer is responsible for the training of personnel, caring for, inspecting, maintaining, and operating 

hydraulic press production systems to ensure their competence.  

  The employer is responsible to provide and ensure that point-of-operation safeguarding is used, checked, 

maintained, and where applicable, adjusted on every production operation performed on a press 

production system.  

 

  

 

A complete and current copy of the ANSI B.11.2 standard can be obtained by contacting the following: 

 

American National Standards Institute 

1430 Broadway 

New York, NY 10018 

 

AMT – The Association For Manufacturing Technology 

7901 Westpark Drive 

McLean, VA 22102 

 

 

Summary of Contents for DAKE 33-672

Page 1: ...ustrial Park Dr Grand Haven MI 49417 150 TON ELECTRIC TIRE PRESS Model 33 672 INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure to follow...

Page 2: ...2 1 REV032022 TABLE OF CONTENTS SAFEGUARDING THE POINT OF OPERATION 2 SPECIFICATIONS 3 SAFETY 4 SET UP 5 OPERATION 5 MAINTENANCE 6 LUBRICATION 6 REPLACING HYDRAULIC OIL 6 TROUBLESHOOTING 6 ELECTRICAL...

Page 3: ...ration safeguarding system The standard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of the h...

Page 4: ...l Travel 15 Width between Uprights 36 Max Daylight 36 Platen Diameter 25 Ram Advance Speed 17 IPM Return Speed Gravity Base 57 x 43 Height 80 Weight 3 600 lbs In the space provided record the serial n...

Page 5: ...press safety signs Keep safety labels in good condition Replace missing or damaged safety labels Do not alter this press from its original design Do not make repairs or adjustments to any hydraulic sy...

Page 6: ...as long as the operator presses the button Ram movement can be stopped at any time by releasing the raise button After the work has been contacted the press will continue to build pressure as the ram...

Page 7: ...lean bucket Replace tube line Oil may be put back into reservoir by removing the fill plug on the top of the reservoir B Press does not hold pressure 1 Loosen tube connections check all connections an...

Page 8: ...e valve adjustment screw should now be accessible and should be adjusted with a 7 32 hex wrench To increase the setting turn the adjustment screw clockwise only adjust screw in small increments before...

Page 9: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 933672 8 REV032022 ELECTRICAL DIAGRAM Drawing No 87489...

Page 10: ...ressure to rated capacity of the press when press hits capacity then relief valve 3 opens returning pump delivery to reservoir 7 For Release With valve 4 centered and piston in extended position relea...

Page 11: ...ead Assy 150 Ton Tire Press 700111 S 1 Table Hoist Sub Assembly 583 4 Clamp Cable 45954 20 Cable 1 4 Dia 43919 8 Hex Nut 3 4 10 43916 2 Hex Nut 1 2 13 43648 4 Lock Washer 5 8 43645 4 Lock Washer 3 8 4...

Page 12: ...latens Must Not Be Loaded Off Center 607 1 Label Model Number 46743 1 Limit Switch Lever Micro 43978 6 Ring Retaining 3 4 Shaft Size 43917 8 Hex Nut 5 8 11 43649 12 Lock Washer 3 4 43647 10 Lock Washe...

Page 13: ...31871 1 Guide Piston 4 43647 10 Lock Washer 1 2 5 43916 10 Hex Nut 1 2 13 6 43359 4 Hex Cap Screw 1 2 13 x 4 1 2 7 8686P 1 Cylinder 150 Ton Tire Press 18 Stroke 8 43817 3 Screw Fl Hd Slot Mach 10 24...

Page 14: ...2 Ring Retaining 1 1 4 Shaft Size 3 744 1 Worm 4 746 1 Worm Shaft Key 1 4 x 1 4 x 3 7 16 5 43982 2 Ring Retaining 1 Shaft Size 6 743 1 Gear Worm 7 739 1 Hoist Frame 8 742 1 Worm Shaft 9 741 1 Drum Sha...

Page 15: ...ks 65696 1 Fitting Tube 37 Deg Straight Thd Elbow SAE O Ring 14 16 51150 1 Coupling Half 7 8 Bore With 1 4 Keyway 43881 4 Self Tapping Screw 10 24 x 3 8 43645 4 Lock Washer 3 8 43348 4 Hex Cap Screw 1...

Page 16: ...r Overload 67040 1 Starter Enclosure 75151 2 Connector Cord 75257 2 Locknut Conduit 1 2 In 302772 1 LED Dock Light 302862 2 Safety Switch 303076 2 Light Bar 2 feet 716813 ELECTRICAL CONTROL ASSEMBLY 4...

Page 17: ...3 8 x 1 4 NPTF 72050 2 Fitting Tube 37 Deg 90 Elbow 3 8 x 3 8 NPTF 71268 1 Gauge 150 Ton Hand 6000 psi 1 4 NPT Male Bottom 53721 1 Pipe Cross 3 4 300 47947P 1 Release Valve Rod Stop 43339 2 Screw 3 8...