![Lafayette Accu-Rise Operating System Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/lafayette/accu-rise-operating-system/accu-rise-operating-system_installation-instructions-manual_3273191007.webp)
INSTALLATION
5
Mount the Installation Brackets — Outside Mount
■
Center the headrail over the window opening at the desired height. Use a pencil to lightly
mark each end of the headrail on the mounting surface.
➤
Alternatively, measure the width of the headrail and use that width to mark the headrail
end points over the window opening.
■
Mark 2" from each end of the headrail.
➤
If more than two installation brackets came with your order, space additional bracket(s)
evenly between the two end brackets and mark their location. Mount into wood
whenever possible.
■
Center the installation brackets on your marks and mark where to drill the screw holes.
➤
A minimum flat vertical surface of 1
1
/
4
" for installation brackets or extension brackets
is required.
➤
The top of the installation brackets or extension brackets should be at the desired height.
The brackets should be level and aligned.
➤
When using extension brackets, mark two screw holes per bracket.
CAUTION:
The rear of the brackets must be flush against a flat mounting surface.
Do
not mount brackets on curved molding.
■
Drill the screw holes using a
3
/
32
" drill bit.
CAUTION:
Use drywall anchors when mounting into drywall.
2"
2"
Space Evenly
Space Evenly
Headrail End Marks
Window Opening
Summary of Contents for Accu-Rise Operating System
Page 1: ...Accu Rise Operating System Installation Instructions Parasol Cellular Shades...
Page 15: ......
Page 16: ...18 67IN 18 3 14...