6 OPERATION
98
TITAN VERSA Operations and Maintenance Manual
LACO Technologies
Maintenance Tasks
This screen sorts the needed maintenance tasks with due dates from closest to
furthest. Maintenance due dates are determined from the maintenance tasks and
intervals table (see Maintenance Tasks and Intervals), product configuration, and when
maintenance was last performed.
When maintenance items are close to being due, the maintenance icon wrench on the
test screen (status icon area) will appear orange. When items are due, the icon will
become red.