background image

 

 

 

 

  BA_020_2019-05_10.00  Pressure transmitter UNIVERSAL 

Page 3/5 

 

3.1  Mechanical Installation 

Before starting operation, check the process connection carefully for leaks under pressure. 

  

Use gaskets, if required, that are suitable for the process connection and resistant to the 
media. 

  

You can use the device in any mounting position. Normally the transmitter is adjusted for a 
vertical mounting position. A different mounting position in combination with a small nomi-
nal  range  might  cause  a  zero  point  offset.  In  this  case  a  zero  point  adjustment  might  be 
necessary. 

  

The  device  is  ventilated  via  the  connecting  cable  with  a  degree  of  IP67  protection  and 
pressure  ranges  up  to  16  bar  /  250  psi.  During  installation  lay  a  ventilated  cable  to  an 
aeratable connection room. This compensates any atmospheric fluctuations.  

  

3.2  Electrical Connection 

Complete the mechanical installation before you connect the device electrically. 

Set up all electrical connections while the voltage supply is switched off. 

  

 

Figure 1: Options of the electrical connection 

  

Operation 

During operation, take care that the device remains within its intended pressure and tem-
perature ranges. No other monitoring is necessary. 

  

The  permissible  ambient  and  media  temperature  depends  on  the  type  of  device  and  its 
design. This information can be found in the relevant data sheet. 

  

Reviews: