Product Service 1-800-522-7658
6
C
C
h
h
a
a
p
p
t
t
e
e
r
r
3
3
:
:
G
G
e
e
t
t
t
t
i
i
n
n
g
g
S
S
t
t
a
a
r
r
t
t
e
e
d
d
Once the site for your glove box is properly prepared, you are ready to
unpack, inspect, install, and validate performance of your system. Read this
chapter to learn how to:
•
Unpack and move the glove box.
•
Set up the glove box with the proper supporting structure and work
surface.
•
Connect an exhaust system to the pressure relief valve (if applicable).
•
Install the gloves.
•
Connect the electrical supply.
•
Connect the plumbing lines for gas, vacuum, and drying train.
•
Validate performance of the glove box.
Each Precise Glove Box model weighs 185 lbs. each (83
kg). The shipping container allows for lifting with a
mechanical lift truck or floor jack. If you must lift the
glove box manually, follow safe-lifting guidelines. Do not
lift by the upper sheet metal façade and front panel as
damage can occur to the glove box liner.
!