Laars NEOTHERM LC User Manual Download Page 8

NeoTherm LC Boilers and Water Heaters

Page 7

On/Off

switch

User 

Interface

Boiler

outlet

temperature

and system

pressure

CONTROLS AND INDICATORS

Each NeoTherm LC includes two burners, and each of these burners has a separate burner controller.  A 

complete system can include up to four boilers, with up to eight burners and eight burner controllers. All 

managed through one (1) User Interface on the Lead boiler.  
After the system starts, the User Interface Panel will automatically present the Home screen:

The icon for each burner controller will appear in one of four colors:

Blue

Normal operation

Red

Lockout

Gray

Standby mode (Burner switch off)

Gray and 

crossed out

Communication problem

Yellow

Hold state. This could be Anti short 

cycle, fan speed transitions, etc.

User Interface

Summary of Contents for NEOTHERM LC

Page 1: ...witch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire depart...

Page 2: ...1 FOR YOUR SAFETY PLEASE READ THIS BEFORE OPERATING 2 What to Do If You Smell Gas 2 POUR VOTRE S CURIT LISEZ AVANT DE METTRE EN MARCHE 3 Que Faire si Vous Sentez une Odeur de Gaz 3 Lighting the Unit...

Page 3: ...to turn the handle on the gas valve Never use tools If the valve handle will not turn by hand don t try to repair it Call a qualified service technician If you force the valve or try to repair it this...

Page 4: ...er la soupape d arr t de gaz N utilisez jamais d outils Si la poign e de la valve ne tourne pas manuellement ne tentez pas de la r parer Communiquez avec un technicien de service qualifi Le fait de fo...

Page 5: ...you do smell gas STOP Follow Step B in the safety information listed above If you don t smell gas go to the next step 8 Slowly turn the manual gas valve to ON The handle on the valve will be parallel...

Page 6: ...La valve est en position OFF lorsque la poign e se trouve angle droit du tuyau de gaz 5 Remplacer le panneau d acc s avant INSTRUCTIONS DE MISE EN MARCHE 1 ARR TEZ Lisez les informations de s curit su...

Page 7: ...If after three attempts the unit still does not light shut down the boiler and call your service technician If the unit has been drained follow these steps 1 See the Installation and Operation Manual...

Page 8: ...ilers with up to eight burners and eight burner controllers All managed through one 1 User Interface on the Lead boiler After the system starts the User Interface Panel will automatically present the...

Page 9: ...e shown above the complete system includes one boiler with two burners To check the operation of an individual burner press one of the large icons on the Home screen The system will present a Status S...

Page 10: ...of the control system s operation was not correct delayed or waiting for a response This does not necessarily indicate a problem If a problem occurs while the system is starting up the system will dec...

Page 11: ...instructions in the Installation and Operating Instructions Manual for the NeoTherm LC Caution Do not use this boiler if any part has been under water Immediately call a qualified service technician...

Page 12: ...Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 9 Brigden Gate Halton Hills Ontario Canada L7G 0A3 905 203 0600 Fax 905 636 0666 www Laars com Printed in U S A Laars Heating Systems 1504 Documen...

Reviews: