background image

4 of 4

6/27/17

Pntd Frmhs Storage Console

STEP 6
Position Bottom Panel (E) between the Left and 
Right Ends.  Align the Groove in the Bottom with 
the Back Panel.  Attach bottom panel to Vertical 
Dividers (H) using 4 M6 * 30MM Bolts (J) and to 
the Right and Left End Panels (B) and (C) with 4 
M6 * 35MM Bolts (I).  Use Wrench (L) to install 
and tighten all bolts.

At this point tighten all assembly 
bolts.  

STEP 6
Position assembled case upright.  Insert 12 Shelf 
Supports (K) in to predrilliled holes in the Left, 
Center and Right hand openings in Console.  Place 
Shelves (F) on the Shelf Supports in the Left and 
Right sides of Console.   Place Shelf (G) on the 
Shelf Supports in center of Console.  Make sure the 
Shelves are seated down firmly on the Shelf 
Supports.    

CARE: Clean with mild soap and wipe dry.

www.llbean.com

Product Support 1 800 341 4341

Reviews: