Rigging procedures
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
3.
Select the pickup point and raise the array.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
F
R
FRONT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
4.
Add additional enclosures under the array:
KS21
A15 Focus or A15 Wide
Lower the array onto a KS21 or a stack of KS21 on
KS21-CHARIOT.
Align the runners and the tracks.
Unlock the KS21-CHARIOT rigging arms.
This step requires two operators.
Hold the enclosure by the handle until the
rigging system is locked.
One by one, lift the enclosures and secure them under
the array.
5.
Connect the enclosure on both sides before adding the next one.
SHLAK!
A15 owner's manual (EN) version 1.2
53