KWC MARLINO 802 141 Installation And Service Instructions Download Page 2

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

1/2" FPT

Inlet:
hot
water

Inlet:
cold
water

Inlet:
hot
water

Inlet:
cold
water

Inlet:
hot
water

Inlet:
cold
water

!

!

!

MIN

IMU

M

MAX

IMU

M

MINIMUM

MAXIMUM

K.37.P4.02

K.37.P4.01

MIN

IMU

M

MAX

IMU

M

MIN

IMU

M

MAX

IMU

M

MIN

IMU

M

MA

XIM

UM

K.37.P4.03

MIN

IMU

M

MAX

IMU

M

102mm 

4"

39mm / 1 17/32"

67mm 

2 5/8"

70mm 

2 3/4"

70mm 

2 3/4"

86mm

3 3/8"

180mm / 7 1/8"

179mm / 7 1/32"

96mm / 3 25/32"

180mm / 7 1/8"

81mm / 
3 3/16"

100mm / 
3 15/16"

58mm / 2 9/32"

39mm / 1 17/32"

58mm / 2 9/32"

1150mm 

45"

1980mm 

78"

840mm 

33"

810mm 

32"

Shower only

Tub / shower

Floor

line

1170mm 

46"

179mm / 7 1/32"

96mm / 3 25/32"

Standard installation:

Back-to-back installation:

!

140mm / 
5 1/2"

+

 /

1

2

Rough in

Standard installation

Back-to-back installation

Dimensions

Back-to-back installation:
In back-to-back installations, cartridge must be
rotated 180° to ensure proper valve operation.

3 port valve, shower only:
Position valve with outlet up. Finished wall must be within the
dimensions shown on finished wall template.

4 port valve, tub and shower:
Position valve with shower outlet marked "S" up and the tub outlet
marked "T" down.
Finished wall must be within the dimensions shown on finished wall
template.

Finished wall template must remain intact for finished
wall surface measurements and as a template for
plastering and / or tiling.

It is not necessary to remove the pressure balancing
cartridge from the valve during normal soldering of
connections, using propane-butane gas. Do not use
OXYGEN-ACETYLENE!

When soldering connections, do not use excessive
heat!
To test the pipe joints, pressurize both hot and cold
inlets!

Summary of Contents for MARLINO 802 141

Page 1: ...leanerscontainaggressive acidic corrosive chemicals or abrasives which will harm the finishandcauseoperationalproblems C Use of these products voids the manufacturer s warranty Operation A counterclockwise rotation opens the valve beginning with cold water Preventing accidental scalding An adjustable hot limit stop reduces risk of exposure to extremely hot water Clockwise rotation of the handle cl...

Page 2: ...kinstallation Dimensions Back to back installation In back to back installations cartridge must be rotated 180 to ensure proper valve operation 3 port valve shower only Position valve with outlet up Finished wall must be within the dimensions shown on finished wall template 4 port valve tub and shower Position valve with shower outlet marked S up and the tub outlet marked T down Finished wall must...

Page 3: ...hin the valve body Cartridge is correctly engaged when pushing the cartridge it will not rotate InstallationBack to back ifapplicable Installation of the escutcheon 8 Install escutcheon screws 7 into valve cover posts Slide the escutcheon 8 over the screw heads and rotate escutcheon counterclockwise Tighten the screws 7 so the escutcheon is firmly pressed against the wall and does not rotate Do no...

Page 4: ...rrectly set Either the hot or cold side is not fully pressurized Debris caught inside the inlet of the cartridge No engagement between escutcheon and plastic driver Improper installation Remedy Rotate cartridge as described in Back to back installation Allow approximately 3 5 minutes to drain column or push lever on tub spout to the tub fill position Reset the hot limit stop ring as described in r...

Reviews: