2-9
Installation
54-0182 Rev. A1
When wiring is done properly, the sets of cables will overlap each
other, as illustrated in Figure 2-15.
A switchplate has been provided to serve as the hub of the
TracVision S3 wiring (with the exception of the RF cable, which
will be connected to the IRD). This switchplate includes an
ON/OFF switch and a DB9 maintenance port for easy access to
the Antenna Unit’s software and diagnostics. Follow these steps
to begin the wiring process.
1. Select a location to mount the TracVision S3
switchplate. It should be flat and within reach of
the cables connected to the Antenna Unit.
2. Create a panel cutout in the mounting surface.
Figure 2-16 illustrates the mounting dimensions
and a template has been provided in
Figure 2-15
Cable Overlap within the
TracVision S3 Baseplate
Figure 2-16
Switchplate Panel
Cutout Dimensions
A full-scale panel cutout template
has been provided in