Maintenance
87
Maintenance
intervals
Aft
er the
first
5 ho
urs of
op
eratio
n
Daily
Aft
er 20 ho
urs o
f op
eratio
n
Aft
er 30 ho
urs o
f op
eratio
n
Aft
er 250 ho
urs o
f op
eratio
n
On
ce per se
ason
Aft
er heavy u
se
As requ
ired
In case
of wear
Lub
ricatio
n
Greasin
g
Insp
ectio
n
Repla
cemen
t
Clean
ing
Page
General
All bolts
•
•
•
Visual inspection
•
•
•
Bearing
•
•
•
Hose connections
•
•
Air pressure
•
•
•
Lighting equipment
•
•
•
Hydraulics
Hydraulic hoses every 6 years
•
•
•
Hydraulic cylinders
•
•
•
•
Hydraulic couplings
•
•
PTO shafts
Single joints
•
•
•
•
•
PTO shaft guard
•
•
•
•
•
Profile section tube
•
•
•
•
Gearbox
Rotor gear
•
•
Angular gear
•
•
Summary of Contents for Vicon Andex 724
Page 107: ...EC Conformity Declaration 107 ...
Page 108: ...EC Conformity Declaration 108 ...