background image

Figure 2, Basic Switch Settings

ON

OFF

ON

OFF

OFF

ON

OFF

ON

OFF

ON

Summary of Contents for 091-32

Page 1: ...L in NY 631 567 0314 631 567 0314 631 567 0314 631 567 0314 631 567 0314 TOLL FREE 800 346 0857 800 346 0857 800 346 0857 800 346 0857 800 346 0857 FAX 631 567 5826 631 567 5826 631 567 5826 631 567 5...

Page 2: ...MMING Recognizing that priorities may change after an installation is made the LOAD MANAGER is designed so that the sequence of load removal may be easily altered At installation the highest priority...

Page 3: ...Nothing should be connected to the unused may remain unused Nothing should be connected to the unused may remain unused Nothing should be connected to the unused outputs Relays must have a coil resis...

Page 4: ...MODEL 091 32 LOD MANAGER Connection to Pin 2 is not required for Load Manager operation Pins 3 4 5 6 7 8 9 These pins connect to the low side of the relays The relay coils must be energized with 12 v...

Page 5: ...s 12 3 volts for PIE units If Pin 14 is not connected the Load Manager is a simple sequencer When Pin 14andPin12aresimultaneouslysuppliedwith 12voltstheLoadManagerwillsequencetheloads ON and sheds exc...

Page 6: ...Figure 2 Basic Switch Settings ON OFF ON OFF OFF ON OFF ON OFF ON...

Page 7: ...Figure 3 Outline load Manager...

Page 8: ...Figure 1 Schematic Load Manager Installation LOAD MANAGER 091 32...

Page 9: ...se within 3 years from the date the equipment was shipped Equipment is to be returned shipping charges prepaid and will be returned after repair shipping charges paid Kussmaul Electronics Company Inc...

Reviews: